Stanley Ave Persrvation LLC
1 property · 336 units
Tenant score
No tenant reviews yet. The public record below is drawn from government sources and does not depend on reviews.
Public Records
Top 3%of this area owners with records
Fewer housing-code records than 97% of this area owners that have records on file — most owners have none, and are not ranked.
- Violations on record
- 280vs. 83.3 per 100 units
- Confirmed still open
- 21
We have no recorded transfer on file for this property, so the records below may include ones that predate this owner.
We don't yet have complaints and eviction filings for this area, so they are not counted here or in the score. A blank is not a clean record — it means we have nothing to show.
Derived from public records. Not tenant opinion.
Properties and ownership1 property
Ownership records
Public records indicate this owner is connected to 1 property totalling 336 units. Connections between entities are inferred from public filings and are shown with the evidence behind them.
| Property | Units | On record | Recorded |
|---|---|---|---|
| 875 PENNSYLVANIA AVENUEBrooklyn, NYSSL 3043690001 | 336 | 21 | — |
Sources: NYC HPD — Multiple Dwelling Registrations and Registration Contacts. Ownership information is presented as recorded and may be incomplete or out of date.
Company links are inferences from shared addresses, agents and name similarity — never a finding. Each one shows the evidence that produced it.
Tenant reviews (0)
Ordered by what other tenants found helpful (§3.6). Voting changes the order only — never a score.
No published reviews yet.
Every violation on record
The individual records behind the counts above, most recent first.
| Opened | Property | Severity | What was recorded | Status |
|---|---|---|---|---|
| 10 Sept 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7N, 7th STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 Sept 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 7J, 7th STORY, 1st APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 1 Sept 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING, WALL OUTLETS AND LIGHT SWITCHES IN THE ENTIRE APARTMENT LOCATED AT APT 7J, 7th STORY, 1st APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 1 Sept 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE AT CEILING AND WALLS. WINDOWS BROKEN AND PLYWOOD SEALED IN THE ENTIRE APARTMENT LOCATED AT APT 7J, 7th STORY, 1st APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 27 Jul 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE BATHROOM LOCATED AT APT 8A, 8th STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 27 Jul 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 8A, 8th STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 27 Jul 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 8A, 8th STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 27 Jul 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 8A, 8th STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 27 Jul 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8A, 8th STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 6 Jul 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT DOOR LEADING TO FIRE STAIRS A , 12th STORY | Closed 21 Jul 2026 |
| 16 Jun 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT HOPPER DOOR AT PUBLIC HALL, 12th STORY | Confirmed still open |
| 16 Jun 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE CONTROL ARM AT DOOR LEADING TO FIRE STAIRS A , 1st STORY | Closed 29 Jun 2026 |
| 16 Jun 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE CONTROL ARM AT BUILDING ENTRANCE DOOR , 1st STORY | Closed 29 Jun 2026 |
| 9 Jun 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH, TO PUBLIC HALL STAIRS AT PUBLIC HALL, 1st STORY | Closed 29 Jun 2026 |
| 9 Jun 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH, AT HOPPER DOOR AT PUBLIC HALL, 3rd STORY | Closed 29 Jun 2026 |
| 26 May 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT CEILING AT THE RISER IN THE KITCHEN LOCATED AT APT 12K, 12th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 2 Aug 2026 |
| 26 May 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT BAHTUB IN THE BATHROOM LOCATED AT APT 12K, 12th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 2 Aug 2026 |
| 11 May 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR AT VESTIBULE , 1st STORY | Closed 30 Jul 2026 |
| 4 May 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 27 May 2026 |
| 4 May 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 27 Jul 2026 |
| 4 May 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 27 Jul 2026 |
| 4 May 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 13F, 13th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 4 May 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 13F, 13th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 22 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR AT EAST LEADING TO REAR YARD AT PUBLIC HALL, 1st STORY | Closed 17 May 2026 |
| 22 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR FRAME AT FIRE DOOR AT NORTH LEADING TO PUBLIC STAIRS A AT PUBLIC HALL, 1st STORY | Closed 24 May 2026 |
| 22 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 27 Jul 2026 |
| 21 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT STAIRCASE B DOOR AT FIRE STAIRS, 8th STORY | Closed 7 May 2026 |
| 21 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AT BULKHEAD AT STAIR A , 8th STORY | Closed 17 May 2026 |
| 20 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT ENTRANCE DOOR | Closed 20 May 2026 |
| 20 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | 28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AND SILL AT ... IN THE ENTRANCE LOCATED AT APT 7B, 7th STORY, 6th APARTMENT FROM NORTH AT EAST | Closed 17 Aug 2026 |
| 15 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 14P, 14th STORY, 4th APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 13 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT AT CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18362542 ISSUED 11-NOV-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b). | Confirmed still open |
| 13 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING GREATER THAN 10SQ FT (15SQ FT) IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18067229 ISSUED 04-JUL-25 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE 27-2017.3a(5)(a) or (b). | Closed 23 Jul 2026 |
| 13 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 10SQ FT AT WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16181017 ISSUED 23-AUG-23 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE 27-2017.3a(5)(a) or (b). | Confirmed still open |
| 13 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 10SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16181015 ISSUED 23-AUG-23 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE 27-2017.3a(5)(a) or (b). | Closed 23 Jul 2026 |
| 13 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16149788 ISSUED 08-AUG-23 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRATIVE CODE 27-2017.3a(5)(a) or (b). | Closed 23 Jul 2026 |
| 13 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTIALTION SYSTEM AT EAST WALL IN THE BATHROOM LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 21 Sept 2026 |
| 10 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS AT STAIR CASE ''A'' DOOR LEADING TO 2ND STORY AT EAST AT PUBLIC HALL, 1st STORY | Closed 6 Jul 2026 |
| 10 Apr 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR HINGES AT RECYCLING ROOM AT WEST AT PUBLIC HALL, 1st STORY | Closed 1 May 2026 |
| 31 Mar 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCK DOOR AT 1ST STORY AT BOILER ROOM, 1st STORY | Closed 22 Jun 2026 |
| 31 Mar 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 16C, 16th STORY, 7th APARTMENT FROM NORTH AT EAST | Closed 26 Apr 2026 |
| 16 Mar 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BACK YARD AT BOILER ROOM | Closed 6 Apr 2026 |
| 16 Mar 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 6 Apr 2026 |
| 16 Mar 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BACK YARD AT BOILER ROOM | Closed 6 Apr 2026 |
| 16 Mar 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 13 Apr 2026 |
| 16 Mar 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT NORTH WALL IN THE BATHROOM LOCATED AT APT 16C, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 16 Mar 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 14B, 14th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 15 Jun 2026 |
| 7 Jan 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST | Closed 26 Mar 2026 |
| 7 Jan 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST | Closed 26 Mar 2026 |
| 7 Jan 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST | Closed 26 Mar 2026 |
| 7 Jan 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPAIR = 0; WG TO REPLACE = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST | Closed 26 Mar 2026 |
| 7 Jan 2026 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST | Closed 26 Mar 2026 |
| 22 Dec 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE BATHROOM LOCATED AT APT 5K, 5th STORY | Closed 6 Apr 2026 |
| 22 Dec 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 5K, 5th STORY | Closed 6 Apr 2026 |
| 22 Dec 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RUBBER MOLDINGS IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST | Closed 6 Apr 2026 |
| 5 Dec 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 12 Jun 2026 |
| 5 Dec 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, WEST WALL AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 6 Apr 2026 |
| 5 Dec 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, WEST WALL AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 16 Mar 2026 |
| 5 Dec 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, NORTH WALL, AND SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 6 Apr 2026 |
| 5 Dec 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, SOUTH WALL, AND NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 16 Mar 2026 |
| 5 Dec 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 6 Apr 2026 |
| 5 Dec 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 16 Mar 2026 |
| 1 Dec 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 22 Dec 2025 |
| 28 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GLASS PANE AT UPPER WINDOW SASH AT THE 2ND WINDOW FROM SOUTH AT WEST IN THE 3rd ROOM FROM NORTH LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 9 Mar 2026 |
| 28 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQFT AT CEILING, NORTH WALL, SOUTH WALL AND WEST WALL IN THE BATHROOM LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 13 May 2026 |
| 28 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GLASS PANE AT BUILDING ENTRANCE DOOR , 1st STORY | Closed 18 Mar 2026 |
| 24 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | HMC- §272024 PROVIDE AND MAINTAIN A PURE AND WHOLESOME WATER SUPPLY THAT WAS FOUND DISCOLORED AT AT BATHTUB IN THE BATHROOM LOCATED AT APT 9L, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 24 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 17 Jun 2026 |
| 24 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 6 Apr 2026 |
| 24 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 17 Jun 2026 |
| 24 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 17 Jun 2026 |
| 21 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Closed 30 Dec 2025 |
| 21 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 11 Feb 2026 |
| 17 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 17 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT AT CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 13 Apr 2026 |
| 10 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 15 Jun 2026 |
| 10 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 16 Apr 2026 |
| 5 Nov 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 15 Jun 2026 |
| 30 Oct 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 22 Jan 2026 |
| 22 Oct 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST | Closed 6 Apr 2026 |
| 22 Oct 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 5K, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST | Closed 6 Apr 2026 |
| 22 Oct 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST | Closed 15 Jun 2026 |
| 6 Oct 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 9L, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 3 Nov 2025 |
| 6 Oct 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 9L, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 26 Jan 2026 |
| 24 Sept 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Closed 20 Jan 2026 |
| 9 Sept 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY | Closed 23 Sept 2025 |
| 9 Sept 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING AT PUBLIC HALL, 1st STORY | Closed 23 Sept 2025 |
| 9 Sept 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Closed 23 Sept 2025 |
| 8 Sept 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 29 Sept 2025 |
| 8 Sept 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT BATHTUB IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 29 Sept 2025 |
| 5 Aug 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 23 Sept 2025 |
| 5 Aug 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 23 Sept 2025 |
| 5 Aug 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 25 Aug 2025 |
| 28 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AT FLOOR TILES IN THE 1st ROOM FROM NORTH LOCATED AT APT 9L, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 9 Oct 2025 |
| 28 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 9L, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 9 Oct 2025 |
| 28 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ AT CEILING IN THE BATHROOM LOCATED AT APT 9L, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 5 Oct 2025 |
| 28 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS IN THE BATHROOM LOCATED AT APT 9L, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 9 Oct 2025 |
| 28 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 9L, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 9 Oct 2025 |
| 28 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 9L, 9th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 9 Oct 2025 |
| 7 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT BUILDING ENTRANCE DOOR , 1st STORY | Closed 25 Sept 2025 |
| 7 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING GREATER THAN 10SQ FT (15SQ FT) IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Apr 2026 |
| 1 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEIILING AT PUBLIC HALL, 1st STORY | Closed 23 Sept 2025 |
| 1 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALL AT THE CEILING AT PUBLIC HALL, 1st STORY | Closed 23 Sept 2025 |
| 1 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE NORTH WALL, AND THE WEST WALL IN THE BATHROOM LOCATED AT APT 12H, 12th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 23 Sept 2025 |
| 1 Jul 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, AND THE WEST WALL IN THE BATHROOM LOCATED AT APT 12H, 12th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 23 Sept 2025 |
| 9 Jun 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES, BULKHEAD TO ROOF, STAIRWAY ''B'', 2ND PUBLIC STAIRS FROM NORTH AT PUBLIC HALL, 16th STORY | Closed 23 Jun 2025 |
| 9 Jun 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY | Closed 23 Jun 2025 |
| 9 Jun 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY | Closed 8 Jul 2025 |
| 9 Jun 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Closed 1 Jul 2025 |
| 5 Jun 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY | Closed 9 Jul 2025 |
| 5 Jun 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT PUBLIC HALL, 1st STORY | Closed 23 Jun 2025 |
| 5 Jun 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Closed 1 Jul 2025 |
| 3 Jun 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR LEADING TO YARD AT NORTH , 1st STORY | Closed 23 Jun 2025 |
| 3 Jun 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT HOPPER DOOR TO COMPACTOR CHUTE AT PUBLIC HALL, 10th STORY | Closed 23 Jun 2025 |
| 2 Jun 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 15 Jun 2026 |
| 30 May 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY | Closed 23 Sept 2025 |
| 30 May 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY | Closed 23 Sept 2025 |
| 27 May 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AT PUBLIC HALL, 1st STORY | Closed 23 Sept 2025 |
| 27 May 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Closed 23 Jun 2025 |
| 23 May 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 2nd ROOM FROM NORTH LOCATED AT APT 16M, 16th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 6 Jun 2025 |
| 24 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR THAT IS MISSING AT PUBLIC HALL | Closed 30 May 2025 |
| 24 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL | Closed 30 May 2025 |
| 24 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM THAT IS MISSING AT PUBLIC HALL | Closed 30 May 2025 |
| 19 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORY | Closed 30 May 2025 |
| 19 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Closed 29 Apr 2025 |
| 19 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT PUBLIC HALL, 1st STORY | Closed 29 Apr 2025 |
| 19 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Closed 29 Apr 2025 |
| 19 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL, 1st STORY | Closed 30 May 2025 |
| 19 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. | Closed 29 Apr 2025 |
| 19 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Closed 29 Apr 2025 |
| 4 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL | Closed 29 Apr 2025 |
| 4 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING., 1st STORY | Closed 29 Apr 2025 |
| 4 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM ... , 1st STORY | Closed 30 May 2025 |
| 4 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD., 1st STORY | Closed 29 Apr 2025 |
| 4 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR ... , 1st STORY | Closed 30 May 2025 |
| 3 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING AT PUBLIC HALL, 1st STORY | Closed 29 Apr 2025 |
| 3 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT THE CEILING AT PUBLIC HALL, 1st STORY | Closed 23 Sept 2025 |
| 3 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE NORTH, EAST, SOUTH, WEST WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 29 Apr 2025 |
| 3 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH, EAST, SOUTH, WEST WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 5N, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 15 Apr 2025 |
| 3 Mar 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GAPS OR CRACKS IN WALLS, CEILINGS, FLOORS, FIXING LEAKS AND MANAGING GARBAGE IN PUBLIC AREAS. EVIDENCE FOUND AT RATS EXCRETA IN THE ENTIRE APARTMENT LOCATED AT APT 5N, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 17 Jun 2025 |
| 4 Feb 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 15 Jun 2026 |
| 4 Feb 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 1 Jul 2025 |
| 4 Feb 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT DOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 29 Apr 2025 |
| 4 Feb 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 30 May 2025 |
| 4 Feb 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 29 Apr 2025 |
| 4 Feb 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT DOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 1 Jul 2025 |
| 4 Feb 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES, AT VESTIBULE AT PUBLIC HALL, 1st STORY | Closed 6 Mar 2025 |
| 4 Feb 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES, TO MAIL ROOM, BUILDING FRONT | Closed 29 Apr 2025 |
| 4 Feb 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES, AT BUILDING ENTRANCE, BUILDING FRONT | Closed 6 Mar 2025 |
| 3 Feb 2025 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT BUILDING ENTRANCE DOOR AT LOBBY, 1st STORY | Closed 29 Apr 2025 |
| 2 Dec 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT 1st BOILER ROOM FROM NORTH | Closed 24 Feb 2025 |
| 2 Dec 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5H, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 24 Feb 2025 |
| 26 Nov 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 2 SQUARE FEET AT CELING IN THE BATHROOM LOCATED AT APT 12H, 12th STORY, 5th APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 17147535 ISSUED 28-JUL-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Closed 24 Jul 2026 |
| 25 Oct 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Closed 6 Mar 2025 |
| 25 Oct 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Closed 6 Mar 2025 |
| 25 Oct 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Closed 6 Mar 2025 |
| 25 Oct 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY | Closed 6 Mar 2025 |
| 25 Oct 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY | Closed 30 May 2025 |
| 25 Oct 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Closed 6 Mar 2025 |
| 25 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 6 Dec 2024 |
| 16 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Closed 6 Mar 2025 |
| 16 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL | Closed 6 Mar 2025 |
| 16 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL | Closed 6 Mar 2025 |
| 16 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL | Closed 6 Mar 2025 |
| 16 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL | Closed 6 Dec 2024 |
| 16 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL | Closed 6 Mar 2025 |
| 11 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LATCH IN THE ENTRANCE LOCATED AT APT 4K, 4th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 29 Apr 2025 |
| 11 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ..LATCH DEFECTIVE IN THE ENTRANCE LOCATED AT APT 4K, 4th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 22 May 2025 |
| 10 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET AT COMPACTOR CLOSET, 3rd STORY | Closed 6 Dec 2024 |
| 10 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET, 3rd STORY | Closed 4 Oct 2024 |
| 6 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORY | Closed 6 Mar 2025 |
| 6 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD., 1st STORY | Closed 6 Dec 2024 |
| 6 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Closed 6 Mar 2025 |
| 6 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY | Closed 6 Mar 2025 |
| 6 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Closed 6 Mar 2025 |
| 6 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY | Closed 30 May 2025 |
| 6 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Closed 6 Mar 2025 |
| 6 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Closed 22 Sept 2024 |
| 4 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE BASE CABINET AT WASHBASIN TO THE EAST WALL IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 6 Dec 2024 |
| 4 Sept 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 7th APARTMENT FROM SOUTH AT WEST | Closed 29 Apr 2025 |
| 21 Aug 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Closed 9 Jul 2025 |
| 21 Aug 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Closed 9 Jul 2025 |
| 21 Aug 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Closed 9 Jul 2025 |
| 21 Aug 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSSING AT PUBLIC HALL, 1st STORY | Closed 9 Jul 2025 |
| 21 Aug 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Closed 9 Jul 2025 |
| 21 Aug 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Closed 9 Jul 2025 |
| 21 Aug 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Closed 9 Jul 2025 |
| 21 Aug 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTROMAGNETIC LOCKING DEVICE AT DOOR ENTRANCE BUILDING 1ST STY , 1st STORY | Closed 10 Dec 2024 |
| 15 Aug 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQFT AT EAST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 31 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2049 ADM CODE POST AND MAINTAIN A STREET NUMBER ON THE FRONT OF THE DWELLING PLAINLY VISIBLE FROM THE SIDEWALK. | Closed 6 Dec 2024 |
| 31 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK ASSEMBLY AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Closed 6 Dec 2024 |
| 31 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Closed 29 Apr 2025 |
| 31 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Closed 29 Apr 2025 |
| 31 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Closed 29 Apr 2025 |
| 31 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Closed 30 May 2025 |
| 31 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY | Closed 29 Apr 2025 |
| 31 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Closed 6 Dec 2024 |
| 31 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Closed 30 May 2025 |
| 29 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 2 SQUARE FEET AT CELING IN THE BATHROOM LOCATED AT APT 12H, 12th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 26 Nov 2024 |
| 29 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 12H, 12th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 23 Sept 2025 |
| 29 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE BATHROOM LOCATED AT APT 12H, 12th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 23 Sept 2025 |
| 29 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE BATHROOM LOCATED AT APT 12H, 12th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 23 Sept 2025 |
| 11 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 12 Nov 2024 |
| 11 Jul 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 18 Dec 2024 |
| 24 Jun 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Closed 29 Sept 2025 |
| 28 May 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT THE BUILDING ENTRANCE DOOR , 1st STORY | Closed 10 Dec 2024 |
| 28 May 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT BUILDING ENTRANCE DOOR , 1st STORY | Closed 10 Dec 2024 |
| 16 May 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 18 Dec 2024 |
| 16 May 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 18 Dec 2024 |
| 16 May 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 18 Dec 2024 |
| 6 May 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 18 Dec 2024 |
| 6 May 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 18 Dec 2024 |
| 6 May 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, THE SOUTH WALL WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 18 Dec 2024 |
| 1 Apr 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 18 Dec 2024 |
| 1 Apr 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 18 Dec 2024 |
| 3 Jan 2024 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3SQFT AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16199358 ISSUED 01-SEP-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Closed 2 May 2024 |
| 13 Dec 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH, SOUTH AND WEST WALLS IN THE FOYER LOCATED AT APT 6A, 6th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 10 Jun 2024 |
| 13 Dec 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, NORTH, EAST AND WEST WALLS IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 10 Jun 2024 |
| 13 Dec 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 10 Jun 2024 |
| 13 Dec 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 6 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 10 Jun 2024 |
| 8 Nov 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 16N, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 3 Nov 2025 |
| 8 Nov 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT DOORJAM ENCASEMENT IN THE BATHROOM LOCATED AT APT 16N, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 6 May 2024 |
| 30 Oct 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 16N, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 21 Jun 2026 |
| 30 Oct 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 16N, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 21 Jun 2026 |
| 20 Oct 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 10 SQ FT. AT NORTH WALL IN THE BATHROOM LOCATED AT APT 16N, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 16 Oct 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY | Closed 15 Apr 2024 |
| 16 Oct 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY | Closed 19 Dec 2023 |
| 16 Oct 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT PUBLIC HALL, 1st STORY | Closed 14 Feb 2024 |
| 16 Oct 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT 1ST FIRE DOOR FROM NORTH AT EAST AT PUBLIC HALL, 2nd STORY | Closed 14 Feb 2024 |
| 5 Sept 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3SQFT AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 3 Jan 2024 |
| 5 Sept 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 27 Dec 2023 |
| 5 Sept 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 27 Dec 2023 |
| 24 Aug 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 10SQ FT AT WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Apr 2026 |
| 24 Aug 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CEILING LIGHT FIXTURE COVER IN THE PRIVATE HALLWAY LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 24 Nov 2023 |
| 24 Aug 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 10SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Apr 2026 |
| 14 Aug 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 5SQ FT AT WEST WALL WITHIN CLOSET AND APPROX 5 SQ FT AT FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 14 Aug 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL WITHIN CLOSET IN THE 3rd ROOM FROM EAST LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Nov 2023 |
| 14 Aug 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Nov 2023 |
| 14 Aug 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Nov 2023 |
| 14 Aug 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Nov 2023 |
| 14 Aug 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Apr 2026 |
| 10 Aug 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 5 SQ FT AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 7B, 7th STORY, 6th APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 15915762 ISSUED 11-APR-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Closed 25 Oct 2024 |
| 24 Jul 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2042 ADM CODE PROVIDE A MIRROR IN SELF-SERVICE ELEVATOR ARRANGED SO AS TO ENABLE A PERSON ENTERING, TO VIEW INSIDE OF ELEVATOR NUMBER FIRST ELEVATOR FROM EAST | Closed 20 Oct 2023 |
| 24 Jul 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT ENTRANCE TO BUILDING AT PUBLIC HALL, 1st STORY | Closed 16 Aug 2023 |
| 24 Jul 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FIRE DOOR AT EAST AT PUBLIC HALL STAIRS, 3rd STORY | Closed 16 Aug 2023 |
| 24 Jul 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FIRE DOOR AT NORTH AT PUBLIC HALL STAIRS, 3rd STORY | Closed 10 Feb 2024 |
| 1 May 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE CEILING, APPROX. 2 SQ.FT. IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 30 Oct 2023 |
| 1 May 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCK DOOR AT CELLAR | Closed 24 Jun 2024 |
| 1 May 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 3 Jul 2024 |
| 1 May 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 6 Dec 2024 |
| 1 May 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 6 Dec 2024 |
| 12 Apr 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 6 Dec 2024 |
| 12 Apr 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 9P, 9th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 3 Aug 2023 |
| 12 Apr 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTICAL OUTLET AT WEST WALL IN THE BATHROOM LOCATED AT APT 7B, 7th STORY, 6th APARTMENT FROM NORTH AT EAST | Closed 11 Sept 2023 |
| 12 Apr 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 5 SQ FT AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 7B, 7th STORY, 6th APARTMENT FROM NORTH AT EAST | Closed 10 Aug 2023 |
| 29 Mar 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 28 Apr 2023 |
| 29 Mar 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 11 May 2023 |
| 29 Mar 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 28 Apr 2023 |
| 16 Mar 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM NORTH LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south'' | Closed 3 Jul 2024 |
| 16 Mar 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED BOILER ROOM DOOR AT CELLAR | Closed 24 Jun 2024 |
| 7 Mar 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR | Closed 24 Jun 2024 |
| 7 Mar 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''south'' | Closed 3 Jul 2024 |
| 7 Mar 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''south'' | Closed 3 Jul 2024 |
| 2 Mar 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 16C, 16th STORY, 7th APARTMENT FROM NORTH AT EAST | Closed 19 Apr 2024 |
| 2 Mar 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 16C, 16th STORY, 7th APARTMENT FROM NORTH AT EAST | Closed 25 Mar 2023 |
| 2 Mar 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 16C, 16th STORY, 7th APARTMENT FROM NORTH AT EAST | Closed 25 Mar 2023 |
| 15 Feb 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 16C, 16th STORY, 7th APARTMENT FROM NORTH AT EAST | Closed 19 Apr 2024 |
| 13 Feb 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 16C, 16th STORY, 7th APARTMENT FROM NORTH AT EAST | Closed 6 Mar 2023 |
| 9 Feb 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED BOILER ROOM DOOR AT CELLAR | Closed 24 Jun 2024 |
| 9 Feb 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 16C, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 14 Mar 2023 |
| 9 Feb 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 16C, 16th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 6 Mar 2023 |
| 25 Jan 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 16C, 16th STORY, 7th APARTMENT FROM NORTH AT EAST | Closed 19 Apr 2024 |
| 25 Jan 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 16C, 16th STORY, 7th APARTMENT FROM NORTH AT EAST | Closed 17 Feb 2023 |
| 18 Jan 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM | Closed 24 Jun 2024 |
| 18 Jan 2023 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 13C, 13th STORY, 7th APARTMENT FROM NORTH AT EAST | Closed 3 Jul 2024 |
| 21 Nov 2022 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 6th APARTMENT FROM NORTH AT EAST | Closed 3 Jul 2024 |
| 21 Nov 2022 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Serious | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHTUB IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 6th APARTMENT FROM NORTH AT EAST | Closed 3 Jul 2024 |
| 8 Mar 2022 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 28 Apr 2023 |
| 8 Mar 2022 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 11 May 2023 |
| 8 Mar 2022 | 875 PENNSYLVANIA AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 28 Apr 2023 |