Ebenezer Plaza Owmer Ib
1 property · 469 units
Tenant score
No tenant reviews yet. The public record below is drawn from government sources and does not depend on reviews.
Public Records
Top 2%of this area owners with records
Fewer housing-code records than 98% of this area owners that have records on file — most owners have none, and are not ranked.
- Violations on record
- 281vs. 59.9 per 100 units
- Confirmed still open
- 12
We have no recorded transfer on file for this property, so the records below may include ones that predate this owner.
We don't yet have complaints and eviction filings for this area, so they are not counted here or in the score. A blank is not a clean record — it means we have nothing to show.
Derived from public records. Not tenant opinion.
Properties and ownership1 property
Ownership records
Public records indicate this owner is connected to 1 property totalling 469 units. Connections between entities are inferred from public filings and are shown with the evidence behind them.
| Property | Units | On record | Recorded |
|---|---|---|---|
| 94 NEW LOTS AVENUEBrooklyn, NYSSL 3038627501 | 469 | 12 | — |
Sources: NYC HPD — Multiple Dwelling Registrations and Registration Contacts. Ownership information is presented as recorded and may be incomplete or out of date.
Company links are inferences from shared addresses, agents and name similarity — never a finding. Each one shows the evidence that produced it.
Tenant reviews (0)
Ordered by what other tenants found helpful (§3.6). Voting changes the order only — never a score.
No published reviews yet.
Every violation on record
The individual records behind the counts above, most recent first.
| Opened | Property | Severity | What was recorded | Status |
|---|---|---|---|---|
| 26 Aug 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 26 Aug 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 24 Aug 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RETURN BUZZER INERCOM SYSTEM FROM THE BUILDING ENTRANCE TO THE PANEL AT WEST WALL IN THE FOYER LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 24 Aug 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING AND EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 24 Aug 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 3 Aug 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6N, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 9 Jun 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Closed 17 Jul 2026 |
| 6 May 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE AT SINK IN THE KITCHEN LOCATED AT APT 8S, 8th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 6 Aug 2026 |
| 6 May 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING FRONT TO NORTH WALL IN THE FOYER LOCATED AT APT 8N, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 6 Apr 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 2 Jul 2026 |
| 17 Feb 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM BELL BUZZER SYSTEM FROM BUILDING ENTRANCE TO WEST WALL IN THE FOYER LOCATED AT APT 9F, 9th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 12 Apr 2026 |
| 13 Feb 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 9F, 9th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 14 Apr 2026 |
| 28 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 28 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 17 Apr 2026 |
| 28 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 17 Apr 2026 |
| 26 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 7X, 7th STORY, 4th APARTMENT FROM WEST AT NORTH , SECTION ''SOUTH'' | Closed 17 Feb 2026 |
| 22 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 7F, 7th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 13 Feb 2026 |
| 22 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 12 Apr 2026 |
| 22 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 7D, 7th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 14 Apr 2026 |
| 20 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 17 Apr 2026 |
| 20 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 17 Apr 2026 |
| 20 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 17 Apr 2026 |
| 14 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT ROOF AT BOILER ROOM | Closed 2 Apr 2026 |
| 12 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Closed 14 Apr 2026 |
| 12 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE FOYER LOCATED AT APT 6V, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | Closed 12 Apr 2026 |
| 12 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WINDOW RECESS AT NORTH IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6V, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | Closed 12 Apr 2026 |
| 12 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 6V, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | Closed 12 Apr 2026 |
| 8 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Closed 23 Mar 2026 |
| 5 Jan 2026 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6V, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Closed 14 Apr 2026 |
| 15 Dec 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 17 Apr 2026 |
| 8 Dec 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 14 Apr 2026 |
| 4 Dec 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE FOYER LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 23 Mar 2026 |
| 4 Dec 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, AND THE CEILING IN THE FOYER LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 23 Mar 2026 |
| 4 Dec 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE KITCHEN LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 23 Mar 2026 |
| 1 Dec 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6N, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST | Closed 23 Dec 2025 |
| 28 Nov 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 14 Apr 2026 |
| 28 Nov 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6I, 6th STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 22 Dec 2025 |
| 28 Nov 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Closed 20 Feb 2026 |
| 24 Nov 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 10C, 10th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 14 Apr 2026 |
| 24 Nov 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 14 Apr 2026 |
| 5 Nov 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3P, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 17 Feb 2026 |
| 29 Sept 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 8T, 8th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' | Closed 13 Oct 2025 |
| 29 Sept 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 8T, 8th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' | Closed 13 Oct 2025 |
| 29 Sept 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN AT EAST WALL IN THE BATHROOM LOCATED AT APT 8T, 8th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' | Closed 13 Oct 2025 |
| 29 Sept 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 8T, 8th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' | Closed 13 Oct 2025 |
| 16 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 20 Oct 2025 |
| 16 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 20 Oct 2025 |
| 11 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 9N, 9th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 14 Apr 2026 |
| 8 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLER AT BOILER ROOM | Closed 12 Apr 2026 |
| 8 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 6th APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Closed 31 Jul 2025 |
| 7 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 9N, 9th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 14 Apr 2026 |
| 7 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 9N, 9th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 20 Oct 2025 |
| 7 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6N, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 20 Oct 2025 |
| 7 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6N, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 29 Jul 2025 |
| 7 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 28 Jul 2025 |
| 1 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Closed 12 Apr 2026 |
| 1 Jul 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 23 Jul 2025 |
| 7 Mar 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BASEMENT AT BOILER ROOM | Closed 14 May 2025 |
| 5 Mar 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 26 Mar 2025 |
| 21 Feb 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Closed 14 May 2025 |
| 18 Feb 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 13 Mar 2025 |
| 27 Jan 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 11U, 11th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 27 Jan 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 11U, 11th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 27 Jan 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 27 Jan 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Closed 17 Apr 2025 |
| 27 Jan 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT ROOF AT BOILER ROOM | Closed 25 Mar 2025 |
| 24 Jan 2025 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Closed 17 Apr 2025 |
| 9 Dec 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 7 Apr 2025 |
| 4 Dec 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 11B, 11th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 14 May 2025 |
| 2 Oct 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET FOR REFRIGERATOR DOORS IN THE KITCHEN LOCATED AT APT 7P, 7th STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 13 Oct 2025 |
| 2 Oct 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET COVERS AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 7P, 7th STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 31 Jan 2025 |
| 2 Oct 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT 7P, 7th STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 31 Jan 2025 |
| 2 Oct 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 7P, 7th STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 31 Jan 2025 |
| 18 Sept 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 16 Dec 2024 |
| 17 Sept 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQ FT AT WINDOW RECESS AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 5th APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16980791 ISSUED 17-MAY-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Confirmed still open |
| 22 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 20 Nov 2024 |
| 22 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 20 Nov 2024 |
| 9 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 7 May 2025 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE AT SINK IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Closed 1 Nov 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Closed 31 Oct 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLETS COVER AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Closed 1 Nov 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Closed 31 Oct 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Closed 31 Oct 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Closed 31 Oct 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Closed 13 Apr 2026 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOODEN DOOR AT ENTRANCE IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 1 Nov 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 1 Nov 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 1 Nov 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SWING WINDOW AT EAST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 7 May 2025 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 13 Apr 2026 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT ENTRANCE DOOR MORE THAN 1/2 GAP SPACING IN THE ENTRANCE LOCATED AT APT 3G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 31 Oct 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MAILBOX DOOR P220 , 1st STORY | Closed 1 Nov 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE FOYER LOCATED AT APT 3G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 31 Oct 2024 |
| 8 Jul 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE FOYER LOCATED AT APT 3G, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 31 Oct 2024 |
| 24 Jun 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Closed 3 Oct 2024 |
| 24 Jun 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Closed 3 Oct 2024 |
| 21 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTELINE UNDER WASHBASIN IN THE BATHROOM LOCATED AT APT 8N, 8th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 26 Aug 2024 |
| 20 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT TRASH CHUTE DOOR AT COMPACTOR CLOSET, 3rd STORY | Closed 26 Aug 2024 |
| 20 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT TRASH CHUTE DOOR AT COMPACTOR CLOSET, 3rd STORY | Closed 25 Jul 2024 |
| 20 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT COMPACTOR CLOSET DOOR AT PUBLIC HALL, 3rd STORY | Closed 26 Aug 2024 |
| 20 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT COMPACTOR CLOSET DOOR AT PUBLIC HALL, 3rd STORY | Closed 25 Jul 2024 |
| 20 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 20 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 20 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WINDOW RECESS AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 20 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WINDOW RECESS AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 20 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQ FT AT WINDOW RECESS AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5K, 5th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 17 Sept 2024 |
| 7 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 26 Aug 2024 |
| 7 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 26 Aug 2024 |
| 1 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8T, 8th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 14 May 2025 |
| 1 May 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8T, 8th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 14 May 2025 |
| 29 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8N, 8th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 26 Aug 2024 |
| 29 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND THE SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8N, 8th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 26 Aug 2024 |
| 29 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8N, 8th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 27 Aug 2024 |
| 29 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4N, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 9 Aug 2024 |
| 29 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4N, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 9 Aug 2024 |
| 29 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING THE NORTH WALL, THE EAST WALL, SOUTH WALL, WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4N, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 9 Aug 2024 |
| 29 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4N, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 9 Aug 2024 |
| 25 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 26 Aug 2024 |
| 25 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 26 Aug 2024 |
| 25 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND THE NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 26 Aug 2024 |
| 25 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 26 Aug 2024 |
| 22 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | 28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AND SILL AT , IN THE ENTRANCE LOCATED AT APT 10 C, 10th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 9 Aug 2024 |
| 17 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 15 Aug 2024 |
| 17 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 15 Aug 2024 |
| 17 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH AND WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 15 Aug 2024 |
| 17 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 15 Jul 2024 |
| 17 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6T, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 15 Aug 2024 |
| 2 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE LOWER SASH IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 2 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 2 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 2 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 2 Apr 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GLASS PANE AT WINDOW IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 7 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 9F, 9th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Closed 17 Jun 2024 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3P, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 14 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3P, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 14 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ENTRANCE DOOR HANDLE IN THE 4th ROOM FROM EAST LOCATED AT APT 3P, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 14 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL COVER PLATES AT EAST AND WEST WALLS IN THE 4th ROOM FROM EAST LOCATED AT APT 3P, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 14 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN IN THE BATHROOM LOCATED AT APT 3P, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 14 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL RETURN BUZZER FROM BUILDING FRONT ENTRANCE TO NORTH WALL IN THE ENTRANCE LOCATED AT APT 3P, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 29 Jul 2024 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 3P, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 14 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 3P, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 14 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ENTRANCE DOOR AT WEST IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3P, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 14 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3P, 3rd STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 20 Jun 2024 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 7 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 7 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 7 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 7 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 7 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 7 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH | Closed 22 Apr 2024 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 7K, 7th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 8 Jul 2024 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 7K, 7th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 8 Jul 2024 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Closed 21 Jun 2024 |
| 29 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 7K, 7th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 22 Apr 2024 |
| 27 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 8 Jul 2024 |
| 27 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 8 Jul 2024 |
| 27 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED AT CELLAR AT BOILER ROOM | Closed 25 Mar 2025 |
| 27 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 19 Apr 2024 |
| 27 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE BOARDS AT THE NORTH WALL, EAST WALL, SOUTH WALL, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 27 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE BOARDS AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 26 Jul 2024 |
| 13 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE PIPE AT SINK. IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''96'' | Closed 7 May 2025 |
| 13 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH AND WEST WALLS. IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''96'' | Closed 7 May 2025 |
| 13 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING. IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''96'' | Closed 7 May 2025 |
| 13 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''96'' | Closed 7 May 2025 |
| 7 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET PLATE A WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 7 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 7 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 7 Mar 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE PIPE AT SINK IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL. IN THE KITCHEN LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING. IN THE KITCHEN LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT WINDOW AT SOUTH WALL. IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL. IN THE 2nd ROOM FROM EAST LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT WINDOW AT SOUTH WALL. IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL. IN THE 2nd ROOM FROM EAST LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL. IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING. IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 7M, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4N, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4N, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 22 Nov 2024 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4N, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4N, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 11 Apr 2024 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 14 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 27 Sept 2024 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 14 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 14 May 2025 |
| 28 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 14 May 2025 |
| 12 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 27 Sept 2024 |
| 12 Feb 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 27 Sept 2024 |
| 26 Jan 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4N, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 24 May 2024 |
| 26 Jan 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4N, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 26 Jan 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4N, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 16 Jan 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 14 May 2025 |
| 16 Jan 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 14 May 2025 |
| 16 Jan 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT CELLAR AT BOILER ROOM | Closed 24 Sept 2024 |
| 16 Jan 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 14 May 2025 |
| 12 Jan 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER SYSTEM FROM BUILDING FRONT TO IN THE FOYER LOCATED AT APT 5G, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 13 May 2024 |
| 5 Jan 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 13 Apr 2026 |
| 5 Jan 2024 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 5G, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 7 May 2025 |
| 22 Dec 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL BY THE HEATING RADIATOR APPROXIMATELY 2 SQ FT IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16180674 ISSUED 23-AUG-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Confirmed still open |
| 11 Dec 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2042 ADM CODE PROVIDE A MIRROR IN SELF-SERVICE ELEVATOR ARRANGED SO AS TO ENABLE A PERSON ENTERING, TO VIEW INSIDE OF ELEVATOR NUMBER .. , 1st STORY | Closed 30 Oct 2024 |
| 4 Dec 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT ELECTRICAL LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 14 May 2025 |
| 29 Nov 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WINDOW GLASS BROKE INSIDE IN THE 1st ROOM FROM EAST LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 7 May 2025 |
| 27 Nov 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURES AT CEILING IN THE KITCHEN LOCATED AT APT 4K, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 14 May 2025 |
| 20 Nov 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2P, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 29 Aug 2025 |
| 20 Nov 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2P, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 29 Aug 2025 |
| 9 Nov 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3W, 3rd STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 14 May 2025 |
| 9 Nov 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ELELECTRICAL OUTLET AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3W, 3rd STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 14 May 2025 |
| 9 Nov 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3W, 3rd STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 14 May 2025 |
| 9 Nov 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3W, 3rd STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 14 May 2025 |
| 12 Oct 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST AND SOUTH WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 7 May 2025 |
| 29 Sept 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 14 May 2025 |
| 29 Sept 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN AT NORTH WALL IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 14 May 2025 |
| 29 Sept 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND SHOWER AT CEILING IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 14 May 2025 |
| 20 Sept 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AROUND THE WINDOW RECCESS AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 9F, 9th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 13 Oct 2025 |
| 20 Sept 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 9F, 9th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 12 Apr 2026 |
| 20 Sept 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 9F, 9th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 12 Apr 2026 |
| 24 Aug 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR HANDLE FOR CLOSET AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Oct 2025 |
| 24 Aug 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 24 Aug 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Oct 2025 |
| 24 Aug 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Oct 2025 |
| 24 Aug 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 13 Oct 2025 |
| 24 Aug 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 7 May 2025 |
| 24 Aug 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 7 May 2025 |
| 24 Aug 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL BY THE HEATING RADIATOR APPROXIMATELY 2 SQ FT IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 22 Dec 2023 |
| 7 Aug 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES NO POWER IN THE ENTIRE APARTMENT LOCATED AT APT 10A, 10th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 25 Oct 2023 |
| 7 Aug 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2053 ADM CODE PROVIDE DWELLING WITH A JANITOR OR RESPONSIBLE PERSON OR JANITORIAL SERVICE. | Closed 25 Oct 2023 |
| 7 Aug 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOORS , 4th STORY | Closed 25 Oct 2023 |
| 31 Jul 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4N, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 31 Jul 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4N, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 7 May 2025 |
| 21 Jul 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM THE BUILDING ENTRANCE TO THE NORTH WALL IN THE FOYER LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 9 May 2024 |
| 14 Jun 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 9X, 9th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 14 May 2025 |
| 14 Jun 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE KITCHEN LOCATED AT APT 9X, 9th STORY, 5th APARTMENT FROM WEST AT NORTH | Closed 25 Oct 2023 |
| 12 Jun 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE VESTIBULD DOOR AT PUBLIC HALL, 1st STORY | Closed 22 Jun 2023 |
| 12 Jun 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 10U, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | Closed 13 Oct 2025 |
| 26 May 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL INTERCOM BUZZER SYSTEM FROM THE BUILDING ENTRANCE TO WEST WALL.... IN THE FOYER LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 30 Oct 2024 |
| 9 May 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT VESTIBULE TO PUBLIC HALL , 1st STORY | Closed 21 Jun 2023 |
| 28 Apr 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8T, 8th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST | Closed 14 May 2025 |
| 28 Apr 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR TILE IN THE 2nd ROOM FROM EAST LOCATED AT APT 8T, 8th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST | Closed 14 May 2025 |
| 27 Mar 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 11 Jun 2023 |
| 27 Mar 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 11 Jun 2023 |
| 27 Mar 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLETS AT NORTH, SOUTH AND WEST WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 11 Jun 2023 |
| 27 Mar 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 11 Jun 2023 |
| 27 Mar 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 11 Jun 2023 |
| 27 Mar 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLETS AT NORTH AND SOUTH WALLS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 11 Jun 2023 |
| 27 Mar 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 11 Jun 2023 |
| 27 Mar 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLETS AT NORTH AND SOUTH WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 11 Jun 2023 |
| 27 Mar 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 11 Jun 2023 |
| 27 Mar 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 11 Jun 2023 |
| 27 Mar 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 5th ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 11 Jun 2023 |
| 28 Feb 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT BOILER ROOM AT THE ROOF | Closed 10 Mar 2023 |
| 2 Feb 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 8X, 8th STORY, 5th APARTMENT FROM WEST AT NORTH , SECTION ''SOUTH'' | Closed 7 May 2025 |
| 2 Feb 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 8X, 8th STORY, 5th APARTMENT FROM WEST AT NORTH , SECTION ''SOUTH'' | Closed 4 Dec 2023 |
| 25 Jan 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Closed 10 Mar 2023 |
| 25 Jan 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6M, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 1 Mar 2023 |
| 18 Jan 2023 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6M, 6th STORY, 7th APARTMENT FROM WEST AT NORTH | Closed 1 Mar 2023 |
| 5 Dec 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 9H, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 1 Mar 2023 |
| 28 Nov 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 9R, 9th STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 20 Dec 2022 |
| 28 Nov 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM | Closed 27 Feb 2023 |
| 28 Nov 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT APT9H9, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 20 Dec 2022 |
| 3 Nov 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3F, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 11 Jun 2023 |
| 31 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM | Closed 24 Sept 2024 |
| 31 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 11 Jun 2023 |
| 28 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Closed 17 Apr 2023 |
| 28 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY | Closed 17 Apr 2023 |
| 28 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORY | Closed 17 Apr 2023 |
| 28 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Closed 17 Apr 2023 |
| 28 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL, 1st STORY | Closed 27 Feb 2023 |
| 28 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT PUBLIC HALL, 1st STORY | Closed 17 Apr 2023 |
| 28 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Closed 17 Apr 2023 |
| 28 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Closed 17 Apr 2023 |
| 28 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 9P, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' | Closed 17 Apr 2023 |
| 28 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 9P, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' | Closed 27 Feb 2023 |
| 28 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 9P, 9th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' | Closed 31 Mar 2023 |
| 18 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Closed 24 Sept 2024 |
| 17 Oct 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 11 Jun 2023 |
| 23 Sept 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 10U, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | Closed 11 Jun 2023 |
| 23 Sept 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 10U, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | Closed 11 Jun 2023 |
| 23 Sept 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 10U, 10th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | Closed 11 Jun 2023 |
| 10 Mar 2022 | 94 NEW LOTS AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 5 Dec 2022 |