Chv 690-738 Albany Avenue LP
2 properties · 209 units
Tenant score
No tenant reviews yet. The public record below is drawn from government sources and does not depend on reviews.
Public Records
Top 9%of this area owners with records
Fewer housing-code records than 91% of this area owners that have records on file — most owners have none, and are not ranked.
- Violations on record
- 262vs. 125.4 per 100 units
- Confirmed still open
- 141
We have no recorded transfer on file for these properties, so the records below may include ones that predate this owner.
We don't yet have complaints and eviction filings for this area, so they are not counted here or in the score. A blank is not a clean record — it means we have nothing to show.
Derived from public records. Not tenant opinion.
Properties and ownership2 properties
Ownership records
Public records indicate this owner is connected to 2 properties totalling 209 units. Connections between entities are inferred from public filings and are shown with the evidence behind them.
| Property | Units | On record | Recorded |
|---|---|---|---|
| 738 ALBANY AVENUEBrooklyn, NYSSL 3048290003 | 114 | 79 | — |
| 690 ALBANY AVENUEBrooklyn, NYSSL 3048290004 | 95 | 62 | — |
Sources: NYC HPD — Multiple Dwelling Registrations and Registration Contacts. Ownership information is presented as recorded and may be incomplete or out of date.
Company links are inferences from shared addresses, agents and name similarity — never a finding. Each one shows the evidence that produced it.
Tenant reviews (0)
Ordered by what other tenants found helpful (§3.6). Voting changes the order only — never a score.
No published reviews yet.
Every violation on record
The individual records behind the counts above, most recent first.
| Opened | Property | Severity | What was recorded | Status |
|---|---|---|---|---|
| 23 Sept 2026 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE FOYER LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 23 Sept 2026 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE FOYER LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 23 Sept 2026 | 738 ALBANY AVENUEBrooklyn, NY | Serious | 566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF EVIDENCE OF FLIES THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 5M, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 23 Sept 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SINK CABINET WOOD BASE IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 18 Sept 2026 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT APT3K, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 18 Sept 2026 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT APT3K, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 18 Sept 2026 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT APT3K, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 17 Sept 2026 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF LOCKED DOOR AT TRASH CHUTE AT ALL STORIES AT COMPACTOR CLOSET | Confirmed still open |
| 8 Sept 2026 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Confirmed still open |
| 8 Sept 2026 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE | Confirmed still open |
| 8 Sept 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LEAKING RADIATOR AT EAST IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1K, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 8 Sept 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT SWITCH AT WEST WALL IN THE KITCHENETTE LOCATED AT APT 1K, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 8 Sept 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING BETWEEN COUNTERTOP AND CERAMIC WALL TILES IN THE KITCHENETTE LOCATED AT APT 1K, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 8 Sept 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD ENTRANCE DOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4H, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 8 Sept 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD ENTRANCE DOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4H, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 8 Sept 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 8 Sept 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BOTTOM PANEL AT WOOD BASE CABINET UNDER SINK IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 17 Aug 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE LOCATED AT APT 3S, 3rd STORY | Confirmed still open |
| 17 Aug 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE LOCATED AT APT 3S, 3rd STORY | Confirmed still open |
| 28 Jul 2026 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6I, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 28 Jul 2026 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES THOUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 6I, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1I, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE KITCHEN LOCATED AT APT 3S, 3rd STORY | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 3S, 3rd STORY | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE KITCHEN LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 14 Aug 2026 |
| 27 Jul 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 14 Aug 2026 |
| 23 Jul 2026 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT THE ENTRY DOOR IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | Confirmed still open |
| 23 Jul 2026 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | Closed 11 Aug 2026 |
| 23 Jul 2026 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOOR FRAME AT ENTRY IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | Confirmed still open |
| 15 Jun 2026 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHENETTE LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Confirmed still open |
| 15 Jun 2026 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOOR IN THE BATHROOM LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Confirmed still open |
| 15 Jun 2026 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Confirmed still open |
| 15 Jun 2026 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Confirmed still open |
| 19 May 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 17 Sept 2026 |
| 8 May 2026 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 27 May 2026 |
| 8 May 2026 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 27 May 2026 |
| 20 Apr 2026 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT BUILDING ENTRANCE DOOR | Closed 20 Jul 2026 |
| 19 Mar 2026 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 20 Jul 2026 |
| 19 Mar 2026 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 14 Jan 2026 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 2O, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' ORIGINAL VIOLATION 18236199 ISSUED 11-SEP-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b). | Confirmed still open |
| 12 Jan 2026 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' ORIGINAL VIOLATION 18229016 ISSUED 10-SEP-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b). | Confirmed still open |
| 8 Dec 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2P, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 17 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION SYSTEM AT CEILING IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 7 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHENETTE LOCATED AT APT 2Q, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2Q, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 4 Jan 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD DOOR IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY IN THE ENTRANCE LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH IN THE ENTRANCE LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 4 Jan 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY IN THE ENTRANCE LOCATED AT APT 3C, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH IN THE ENTRANCE LOCATED AT APT 3C, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SOUTH'' | Closed 26 Mar 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTELINE IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SOUTH'' | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SOUTH'' | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY IN THE ENTRANCE LOCATED AT APT 3G, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH IN THE ENTRANCE LOCATED AT APT 3G, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 4 Jan 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL STOPPER AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 26 Mar 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT SWITCH AT WEST WALL IN THE FOYER LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1L, 1st STORY | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 4Q, 4th STORY, 5th APARTMENT FROM NORTH AT EAST , SECTION ''CENTER'' | Closed 4 Jan 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 4Q, 4th STORY, 5th APARTMENT FROM NORTH AT EAST , SECTION ''CENTER'' | Closed 4 Jan 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4Q, 4th STORY, 5th APARTMENT FROM NORTH AT EAST , SECTION ''CENTER'' | Closed 26 Mar 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | 566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 6th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY IN THE ENTRANCE LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH IN THE ENTRANCE LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 4 Jan 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHENETTE LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 26 Mar 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 26 Mar 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHENETTE LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 6 May 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 26 Mar 2026 |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILLATION IN THE KITCHENETTE LOCATED AT APT 6I, 6th STORY, 5th APARTMENT FROM SOUTH AT WEST , SECTION ''CENTER'' | Confirmed still open |
| 6 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILLATION IN THE BATHROOM LOCATED AT APT 6I, 6th STORY, 5th APARTMENT FROM SOUTH AT WEST , SECTION ''CENTER'' | Confirmed still open |
| 3 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 6N, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 3 Nov 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE UNDER SINK IN THE KITCHEN LOCATED AT APT 6N, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 23 Oct 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 21 Oct 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL, IN THE BATHROOM LOCATED AT APT 6I, 6th STORY, 5th APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 21 Oct 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT CAULKING,AND GROUT JOINTS OF THE CERAMIC TILES AT EAST, SOUTH AND WEST WALLS AROUND BATHTUB, IN THE BATHROOM LOCATED AT APT 6I, 6th STORY, 5th APARTMENT FROM SOUTH AT WEST | Closed 26 Mar 2026 |
| 15 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ALL RECEPTACLES AND ALL FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | Confirmed still open |
| 3 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 26 Mar 2026 |
| 3 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM BUILDING ENTRANCE DOOR TO APT PANEL AT EAST WALL IN THE FOYER LOCATED AT APT 4E, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 3 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY IN THE ENTRANCE LOCATED AT APT 4E, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 3 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE FOYER LOCATED AT APT 4E, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 26 Mar 2026 |
| 3 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 26 Mar 2026 |
| 3 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHENETTE LOCATED AT APT 4E, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 3 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 26 Mar 2026 |
| 3 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 4S, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 3 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005, 2012 HMC & § 309 MDL: ABATE THE NUISANCE CONSISTING OF EXCESSIVE STORAGE OF MATERIAL GARBAGE,DEBRIS,BAGES AND OTHER HOUSEHOLD ITEMS IN THE ENTIRE APARTMENT LOCATED AT APT 4T, 4th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 3 Nov 2025 |
| 3 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4T, 4th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 3 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 2 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES DUE TO NON PAYMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 5th APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 2 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXURE AT CEILING IN THE FOYER LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 2 Oct 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 17 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 2Q, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Confirmed still open |
| 17 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD FLOOR AND SUB FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2Q, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Confirmed still open |
| 17 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 17 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY IN THE ENTRANCE LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 17 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THERMOSTATE AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 17 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ALL RECEPTACLES AND ALL FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALS AND ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 2O, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 2O, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Closed 14 Jan 2026 |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY IN THE ENTRANCE LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SOUTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB IN THE ENTRANCE LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT SWITCH COVER AT NORTH WALL IN THE FOYER LOCATED AT APT 3L, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT SWITCH COVER AT EAST WALL IN THE BATHROOM LOCATED AT APT 3S, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT SWITCH AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND ALL CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2041 ADM CODE PROVIDE A PEEP HOLE IN ENTRANCE DOOR OF THE DWELLING UNIT SO LOCATED SO AS TO PERMIT A PERSON INSIDE THE DWELLING TO VIEW ANY PERSON OUTSIDE ENTRANCE DOOR .. IN THE ENTRANCE LOCATED AT APT 4D, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HARD WOOD AT FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4L, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HARD WOOD AT FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4L, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSE WIRING AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 16 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSE WIRING AT SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1C, 1st STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 15 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARD WOOD AT FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 5I, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 15 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXURE AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5I, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 15 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXURE AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5C, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 15 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DRAWER AT BASE CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 15 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT UPPER CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 15 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 15 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 15 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4J, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATH TUB IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Closed 10 Jan 2026 |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING,NORTH WALL AND WEST WALL IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT WINDOW LOWER SASH IN THE 1st ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ALL RECEPTACLES AND ALL FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND ALL CEILINGS IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT SWITCH COVER AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHENETTE LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHENETTE LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 12 Sept 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH'' | Confirmed still open |
| 19 Aug 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARD WOOD AT FLOOR IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 19 Aug 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4C, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 19 Aug 2025 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 31 Jul 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2P, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 Jul 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL STOPPER AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 Jul 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION IN THE BATHROOM LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 27 Jun 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1K, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 23 Jul 2025 |
| 27 Jun 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1K, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 23 Jul 2025 |
| 27 Jun 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT SWITCH AT WEST WALL IN THE KITCHEN LOCATED AT APT 1K, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 23 Jul 2025 |
| 27 Jun 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE FLANGE EXTENTION FOR WATER CLOSET AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1K, 1st STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 23 Jul 2025 |
| 13 Jun 2025 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 16 Jun 2025 |
| 13 Jun 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 16 Jun 2025 |
| 9 Jun 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LEAKY RADIATOR PIPE AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2K, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 23 Jul 2025 |
| 9 Jun 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 23 Jul 2025 |
| 9 Jun 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 23 Jul 2025 |
| 9 Jun 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 23 Jul 2025 |
| 21 Apr 2025 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 30 Jul 2025 |
| 17 Mar 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET IN THE ENTRANCE LOCATED AT APT 1I, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 29 May 2025 |
| 17 Mar 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT DOOR IN THE ENTRANCE LOCATED AT APT 1I, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 29 May 2025 |
| 17 Mar 2025 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1I, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 29 May 2025 |
| 6 Mar 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2P, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 6 Mar 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2P, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 30 Jul 2025 |
| 6 Mar 2025 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2P, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 6 Jan 2025 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT TRASH ROOM DOOR AT PUBLIC HALL, 5th STORY | Closed 18 Jan 2025 |
| 13 Nov 2024 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH | Closed 2 Dec 2024 |
| 13 Nov 2024 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 13 Nov 2024 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE FOYER LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 19 Feb 2025 |
| 13 Nov 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 19 Feb 2025 |
| 12 Nov 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM, 1st STORY | Closed 3 Jan 2025 |
| 12 Nov 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5R, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Confirmed still open |
| 1 Nov 2024 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE IN THE BATHROOM LOCATED AT APT 2P, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 30 Jul 2025 |
| 1 Nov 2024 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2P, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 31 Oct 2024 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1I, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 10 Dec 2024 |
| 31 Oct 2024 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1I, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 30 Jul 2025 |
| 15 Oct 2024 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1I, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 30 Jul 2025 |
| 5 Sept 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Confirmed still open |
| 5 Sept 2024 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Closed 19 Dec 2024 |
| 5 Sept 2024 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE KITCHEN LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Confirmed still open |
| 12 Aug 2024 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 20 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 5H, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 12 Aug 2024 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5H, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 11 Dec 2024 |
| 2 Jul 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1M, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 16 Jul 2024 |
| 26 Jun 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT RESIDENTIAL SINK,WASHBASIN AND BATHTUB LOCATED AT APT 1D, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 11 Sept 2024 |
| 26 Jun 2024 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1D, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 3 Jan 2025 |
| 26 Jun 2024 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE FOYER LOCATED AT APT 1D, 1st STORY, 4th APARTMENT FROM EAST AT SOUTH | Closed 6 Aug 2024 |
| 24 Jun 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 4 Sept 2024 |
| 24 Jun 2024 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE. IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 4 Sept 2024 |
| 24 Jun 2024 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE. IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 4 Sept 2024 |
| 24 Jun 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED. AT BOILER ROOM | Closed 11 Sept 2024 |
| 24 Jun 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 8 Aug 2024 |
| 30 May 2024 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 10 SQ.FT AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 24 May 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5P, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 4 Sept 2024 |
| 13 May 2024 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 5th APARTMENT FROM EAST AT SOUTH | Closed 11 Sept 2025 |
| 22 Apr 2024 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 7 Oct 2024 |
| 18 Mar 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING MAGNETIC DOOR STOP AT VESTIBULE PREVENTING DOOR FROM CLOSING AT LOBBY, 1st STORY | Closed 18 May 2024 |
| 11 Mar 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT 2ND FROM NORTH AT EAST AT PUBLIC HALL, 5th STORY | Closed 8 Aug 2024 |
| 28 Feb 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF A PERMANENT STOPPER AT FIRE DOOR AT NORTH AT PUBLIC HALL, 1st STORY | Closed 25 Nov 2024 |
| 28 Feb 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF A PERMANENT STOPPER AT COMPACTOR DOOR AT CELLAR STORY AT PUBLIC HALL | Closed 10 Mar 2024 |
| 28 Feb 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR FRAME AT BOILER ROOM | Closed 15 May 2024 |
| 28 Feb 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT 1ST FIRE DOOR FROM NORTH AT EAST AT PUBLIC HALL, 5th STORY | Closed 25 Nov 2024 |
| 28 Feb 2024 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT RECYCLING ROOM AT PUBLIC HALL, 5th STORY | Closed 10 Mar 2024 |
| 6 Dec 2023 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | Closed 8 Mar 2024 |
| 6 Dec 2023 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASH BASIN IN THE BATHROOM LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 21 Mar 2024 |
| 6 Dec 2023 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2R, 2nd STORY, 6th APARTMENT FROM NORTH AT EAST | Closed 8 Mar 2024 |
| 6 Dec 2023 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 2R, 2nd STORY, 6th APARTMENT FROM NORTH AT EAST | Closed 8 Mar 2024 |
| 6 Dec 2023 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 6th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 6 Dec 2023 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 6th APARTMENT FROM NORTH AT EAST | Closed 8 Mar 2024 |
| 6 Dec 2023 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 6th APARTMENT FROM NORTH AT EAST | Closed 8 Mar 2024 |
| 6 Dec 2023 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2P, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 21 Mar 2024 |
| 5 Dec 2023 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET SEAL AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 2Q, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH | Closed 8 Mar 2024 |
| 5 Dec 2023 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET SEAL AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 3S, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 8 Mar 2024 |
| 5 Dec 2023 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN ; THE WASTE LINE DRAIN PIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3S, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 20 Mar 2024 |
| 5 Dec 2023 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL CEILINGS AND ALL WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 5I, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 12 Sept 2025 |
| 5 Dec 2023 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5N, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Closed 8 Mar 2024 |
| 17 Nov 2023 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | Confirmed still open |
| 17 Nov 2023 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4T, 4th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 23 Feb 2024 |
| 17 Nov 2023 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 4T, 4th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 17 Nov 2023 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4T, 4th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 23 Feb 2024 |
| 17 Nov 2023 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4L, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH | Closed 23 Feb 2024 |
| 5 Oct 2023 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE AIR VENT AT CEILING IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 19 Jan 2024 |
| 4 Oct 2023 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE TRASH ROOM AT PUBLIC HALL, 1st STORY | Closed 3 Nov 2023 |
| 4 Oct 2023 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 6; LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 11 Jan 2024 |
| 4 Oct 2023 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 6; IN THE ENTIRE APARTMENT LOCATED AT APT 3U, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST | Closed 11 Jan 2024 |
| 4 Oct 2023 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 6; IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 11 Jan 2024 |
| 3 Oct 2023 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 4; IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 2 Dec 2024 |
| 3 Oct 2023 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 3O, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 19 Jan 2024 |
| 25 Sept 2023 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE LOWER SASH WINDOW AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1I, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Closed 19 Jan 2024 |
| 25 Sept 2023 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 4H, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Closed 7 Dec 2023 |
| 25 Sept 2023 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 6L, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Closed 7 Dec 2023 |
| 25 Sept 2023 | 690 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 6L, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Closed 7 Dec 2023 |
| 13 Jul 2023 | 690 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: REFIT FIRE DOOR IN FIRE STAIR ''A'' AT 5TH STORY | Closed 25 Sept 2023 |
| 28 Apr 2023 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT STAIRWAY B AT PUBLIC HALL STAIRS, 3rd STORY | Closed 18 May 2023 |
| 28 Apr 2023 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HOPPER CHUTE DOOR AT PUBLIC HALL, 6th STORY | Closed 18 May 2023 |
| 28 Apr 2023 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE COMPACTOR CLOSET DOOR AT PUBLIC HALL, 6th STORY | Closed 18 May 2023 |
| 28 Apr 2023 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE COMPACTOR CLOSET DOOR AT PUBLIC HALL, 4th STORY | Closed 18 May 2023 |
| 28 Apr 2023 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE BULKHEAD DOOR AT STAIRWAY A AT PUBLIC HALL STAIRS, 6th STORY | Closed 18 May 2023 |
| 31 Jan 2023 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Closed 2 Mar 2023 |
| 17 Nov 2022 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF HOOK AND EYE INSTALLED AT VESTIBULE DOOR | Closed 10 Feb 2023 |
| 17 Nov 2022 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE COMPACTOR CLOSET DOOR IN THE PUBLIC HALL AT 3RD STORY | Closed 2 Feb 2023 |
| 17 Nov 2022 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE COMPACTOR CLOSET IN THE PUBLIC HALL AT 4TH STORY | Closed 2 Feb 2023 |
| 17 Nov 2022 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE COMPACTOR CLOSET DOOR IN THE PUBLIC HALL AT 5TH STORY | Closed 2 Feb 2023 |
| 17 Nov 2022 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REFIT COMPACTOR CLOSET DOOR IN THE PUBLIC HALL AT 6TH STORY | Closed 31 Mar 2023 |
| 17 Nov 2022 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ROOF BULKHEAD DOOR IN FIRE STAIR ''A'' | Closed 2 Feb 2023 |
| 17 Nov 2022 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE SOUTH FIRE DOOR IN THE PUBLIC HALL AT 1ST STORY | Closed 2 Feb 2023 |
| 17 Nov 2022 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOK AND EYE INSTALLED AT NORTH FIRE DOOR IN THE PUBLIC HALL AT 1ST STORY | Closed 10 Feb 2023 |
| 17 Nov 2022 | 738 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FIRE DOOR IN FIRE STAIR ''A'' AT 2ND STORY | Closed 2 Feb 2023 |
| 16 Nov 2022 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOP AND LOOP INSTALLED FROM FLOOR TO VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Closed 30 Jan 2023 |
| 16 Nov 2022 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING WOODEN WEDGE JAMMED AT FIRE DOOR 1ST FROM EAST AT SOUTH, CENTER SECTION AT PUBLIC HALL, 1st STORY | Closed 30 Jan 2023 |
| 16 Nov 2022 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING WOODEN WEDGE JAMMED AT FIRE DOOR 1ST FROM WEST AT NORTH, CENTER SECTION AT PUBLIC HALL, 1st STORY | Closed 30 Jan 2023 |
| 27 Apr 2022 | 738 ALBANY AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING, APPROXIMATELY 4 SQ FT IN THE BATHROOM LOCATED AT APT 6N, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 14756509 ISSUED 21-DEC-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Confirmed still open |
| 10 Mar 2022 | 738 ALBANY AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 27 Jun 2022 |
| 26 Jan 2022 | 690 ALBANY AVENUEBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 4; WG TO REPLACE = 0; WG TO REPAIR = 0; LOCATED AT APT 2I, 2nd STORY | Closed 1 May 2022 |