Brooklyn 441 LLC
1 property · 62 units
Tenant score
No tenant reviews yet. The public record below is drawn from government sources and does not depend on reviews.
Public Records
Bottom 2%of this area owners with records
Fewer housing-code records than 2% of this area owners that have records on file — most owners have none, and are not ranked.
- Violations on record
- 495vs. 798.4 per 100 units
- Confirmed still open
- 134
We have no recorded transfer on file for this property, so the records below may include ones that predate this owner.
We don't yet have complaints and eviction filings for this area, so they are not counted here or in the score. A blank is not a clean record — it means we have nothing to show.
Derived from public records. Not tenant opinion.
Properties and ownership1 property
Ownership records
Public records indicate this owner is connected to 1 property totalling 62 units. Connections between entities are inferred from public filings and are shown with the evidence behind them.
| Property | Units | On record | Recorded |
|---|---|---|---|
| 441 BROOKLYN AVENUEBrooklyn, NYSSL 3013230017 | 62 | 134 | — |
Sources: NYC HPD — Multiple Dwelling Registrations and Registration Contacts. Ownership information is presented as recorded and may be incomplete or out of date.
Company links are inferences from shared addresses, agents and name similarity — never a finding. Each one shows the evidence that produced it.
Tenant reviews (0)
Ordered by what other tenants found helpful (§3.6). Voting changes the order only — never a score.
No published reviews yet.
Every violation on record
The individual records behind the counts above, most recent first.
| Opened | Property | Severity | What was recorded | Status |
|---|---|---|---|---|
| 24 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Confirmed still open |
| 24 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 24 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 24 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT OBSERVED AT EAST WALL IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 24 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER WALL CABINET AT EAST WALL IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 16 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE DOOR , 1st STORY | Confirmed still open |
| 15 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLE AT PUBLIC HALL, 2nd STORY | Confirmed still open |
| 15 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES AT PUBLIC HALL, 3rd STORY | Confirmed still open |
| 15 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLE AT PUBLIC HALL, 5th STORY | Confirmed still open |
| 15 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES AT PUBLIC HALL, 4th STORY | Confirmed still open |
| 3 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Confirmed still open |
| 3 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 3 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 3 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 3 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WOOD CABINET EAST WALL IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 3 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE SADDLE AT ENTRANCE IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 3 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. OBSERVED AT EAST WALL IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT EAST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 18825479 ISSUED 29-APR-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b). | Confirmed still open |
| 1 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES AND STROLLERS AT PUBLIC HALL, 5th STORY | Confirmed still open |
| 1 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 5th STORY | Confirmed still open |
| 1 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT EAST AND WEST WALL AT PUBLIC HALL, 5th STORY | Confirmed still open |
| 1 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING , 5th STORY | Confirmed still open |
| 1 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING , 4th STORY | Confirmed still open |
| 1 Sept 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING , 4th STORY | Confirmed still open |
| 31 Aug 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 18825476 ISSUED 29-APR-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b). | Confirmed still open |
| 4 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT EAST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 1 Sept 2026 |
| 4 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT WINDOW UPPER SASH IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 29 Aug 2026 |
| 1 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 1 May 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 5 Mar 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CEILING IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' ORIGINAL VIOLATION 18341096 ISSUED 01-NOV-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b). | Confirmed still open |
| 10 Feb 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BUILDING ENTRANCE DOOR | Closed 2 Mar 2026 |
| 10 Feb 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES . IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' | Closed 14 Apr 2026 |
| 20 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 16 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Closed 19 Jun 2026 |
| 16 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 1O SQFT AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER WINDOW SASH IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT 1ST STORY LEADING TO BASEMENT AT BOILER ROOM, 1st STORY | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 1O SQFT AT CEILING IN CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH AT EAST WALL IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 15 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 14 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 5 Feb 2026 |
| 13 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. EAST WALL IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 18220718 ISSUED 11-SEP-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b). | Closed 23 May 2026 |
| 9 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GASKET AT LOWER REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 9 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 9 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 9 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 9 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, EAST AND SOUTH WALLS. IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 9 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 16 Apr 2026 |
| 9 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 9 Jan 2026 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF HOUSEHOLD ITEMS AT 1ST STACK FROM WEST AT NORTH WALL AT FIRE ESCAPE, 3rd STORY | Closed 14 Apr 2026 |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF HOUSEHOLD ITEMS AT 1ST STACK FROM SOUTH AT EAST WALL AT FIRE ESCAPE, 5th STORY | Closed 14 Apr 2026 |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 23 May 2026 |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BUILDING EXTERIOR AT BOILER ROOM | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW, 1ST WINDOW FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 25 Mar 2026 |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW, 1ST WINDOW FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 25 Mar 2026 |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW, 1ST WINDOW FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 25 Mar 2026 |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT 1ST FIRE ESCAPE WINDOW FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF UNCAPPED FLOOR DRAIN IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT 1ST WINDOW FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT 2ND WINDOW FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW, 2ND WINDOW FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TILE AT FLOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 30 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 29 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 21 Jan 2026 |
| 29 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 17 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 14 Apr 2026 |
| 17 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 17 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT COMPACTOR CLOSET HINGE IN THE PUBLIC HALL LOCATED AT PUBLIC PARTS, 2nd STORY | Closed 14 Apr 2026 |
| 17 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 19 Jan 2026 |
| 17 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Closed 21 Apr 2026 |
| 17 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT COMPACTOR CLOSET HINGE IN THE PUBLIC HALL LOCATED AT PUBLIC PARTS, 5th STORY | Closed 14 Apr 2026 |
| 17 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | Closed 14 Apr 2026 |
| 17 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Confirmed still open |
| 17 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE BULKHEAD HINGE IN THE PUBLIC HALL STAIRS LOCATED AT PUBLIC PARTS, 6th STORY, SECTION AT SOUTH | Closed 14 Apr 2026 |
| 12 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 7; WG TO REPAIR = 0; WG TO REPLACE = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 2J , 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 25 Mar 2026 |
| 12 Dec 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER ABOVE 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 2J , 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 6 Mar 2026 |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING AND EAST WALLS AT PUBLIC HALL, 6th STORY, SECTION ''SOUTH'' | Closed 14 Apr 2026 |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILING AND EAST WALLS AT PUBLIC HALL, 6th STORY, SECTION ''SOUTH'' | Closed 14 Apr 2026 |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING AT PUBLIC HALL, 6th STORY, SECTION ''SOUTH'' | Closed 14 Apr 2026 |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY | Closed 14 Apr 2026 |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILING AT PUBLIC HALL, 1st STORY | Closed 14 Apr 2026 |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT THE VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Closed 3 Jan 2026 |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT THE WINDOW AT THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 8 May 2026 |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE CLOSET AT THE NORTH WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE CLOSET AT THE NORTH WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING, NORTH AND WEST WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOTWATER EXCEEDING THE MAXIMUM TEMPERATURE OF 130F DEGREES AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 28 Jan 2026 |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL THE WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 17 Feb 2026 |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND THE BATH TUB IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE THE GROUT BETWEEN THE TILES AT THE EAST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Confirmed still open |
| 5 Nov 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CEILING IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 5 Mar 2026 |
| 27 Oct 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 18046150 ISSUED 21-JUN-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b). | Confirmed still open |
| 20 Oct 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT APARTMENT ENTRANCE IN THE ENTRANCE LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 14 Apr 2026 |
| 15 Sept 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 15 Sept 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 18 Oct 2025 |
| 15 Sept 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM NORTH AT EAST WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 18 Oct 2025 |
| 15 Sept 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 14 Apr 2026 |
| 15 Sept 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 18 Oct 2025 |
| 15 Sept 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. EAST WALL IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 13 Jan 2026 |
| 15 Sept 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 14 Apr 2026 |
| 28 Jul 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE HOUSEHOLD TRASH AT PUBLIC HALL, 6th STORY | Closed 13 Nov 2025 |
| 30 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 23 Oct 2025 |
| 30 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 23 Oct 2025 |
| 30 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 23 Oct 2025 |
| 30 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL AND CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 23 Oct 2025 |
| 30 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 23 Oct 2025 |
| 30 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 23 Oct 2025 |
| 27 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 1st ROOM FROM EAST, THE FOYER , THE BATHROOM , THE 5th ROOM FROM EAST LOCATED AT APT 4J, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 24 Dec 2025 |
| 27 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 22 Oct 2025 |
| 27 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 25 Sept 2025 |
| 27 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WALL CABINET AT EAST WALL IN THE KITCHEN LOCATED AT APT 4J, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 22 Oct 2025 |
| 27 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 25 Oct 2025 |
| 27 Jun 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... FIRE DOOR LEADING TO REAR OF BUILDING (HINGES) AT PUBLIC HALL, 1st STORY | Closed 10 Jul 2025 |
| 27 May 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM | Confirmed still open |
| 27 May 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH | Closed 14 Apr 2026 |
| 27 May 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT DOOR AT COMPACTOR CLOSET, 5th STORY | Closed 15 Sept 2025 |
| 27 May 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT COMPACTOR CLOSET, 5th STORY | Closed 9 Dec 2025 |
| 23 May 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 22 Sept 2025 |
| 23 May 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL. IN THE 1st ROOM FROM EAST LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 22 Sept 2025 |
| 23 May 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 29 Jun 2025 |
| 22 Apr 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FEET AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 17573387 ISSUED 22-DEC-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Confirmed still open |
| 22 Apr 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FEET AT SOUTH WALL, EAST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 17573378 ISSUED 22-DEC-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Confirmed still open |
| 29 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT BATHTUB IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 14 Apr 2026 |
| 29 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FRAME AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 9 May 2025 |
| 29 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 14 Apr 2026 |
| 29 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 9 May 2025 |
| 29 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 9 May 2025 |
| 28 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BUILDING ENTRANCE DOOR , 1st STORY | Closed 28 Feb 2025 |
| 27 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Closed 28 Feb 2025 |
| 27 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 19 May 2025 |
| 27 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RADIATOR SHUT-OFF VALVE KNOB AT PUBLIC HALL, 1st STORY | Closed 9 May 2025 |
| 27 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING WEST AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 9 Apr 2025 |
| 27 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 19 May 2025 |
| 23 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER UNIT PROTRUDING BEYOND 6 INCHES AT 2ND STORY WINDOW SILL BALCONY AT SOUTH AT FIRE ESCAPE | Closed 9 May 2025 |
| 23 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER UNIT PROTRUDING BEYOND 6 INCHES AT 6TH STORY WINDOW SILL BALCONY AT SOUTH AT FIRE ESCAPE | Closed 9 May 2025 |
| 23 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER UNIT PROTRUDING BEYOND 6 INCHES AT 4TH STORY WINDOW SILL BALCONY BUILDING FRONT AT FIRE ESCAPE | Closed 14 Apr 2026 |
| 23 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER UNIT PROTRUDING BEYOND 6 INCHES AT 5TH STORY WINDOW SILL BALCONY BUILDING FRONT AT FIRE ESCAPE | Closed 14 Apr 2026 |
| 23 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR ... IN THE ENTRANCE LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 22 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 19 May 2025 |
| 14 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BUILDING ENTRANCE DOOR LEADING TO VESTIBULE AREA AT PUBLIC HALL, 1st STORY | Closed 2 May 2025 |
| 10 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 21 Apr 2025 |
| 10 Jan 2025 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 21 Apr 2025 |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL AND CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FEET AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 22 Apr 2025 |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 4 Jan 2026 |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 4 Jan 2026 |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 26 Mar 2025 |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 26 Mar 2025 |
| 23 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FEET AT SOUTH WALL, EAST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 22 Apr 2025 |
| 20 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR FRAME AT BULKHEAD AT PUBLIC HALL, 6th STORY | Closed 9 May 2025 |
| 5 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BULK HEAD AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORY | Closed 26 Mar 2025 |
| 5 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT BULKHEAD AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORY | Closed 9 May 2025 |
| 5 Dec 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT UPPER AND LOWER SAHES AT 1ST AND 2ND WINDOW FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 26 Mar 2025 |
| 29 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 27 Feb 2025 |
| 29 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ENAMEL REGLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 14 Apr 2026 |
| 29 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 14 Apr 2026 |
| 29 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 27 Feb 2025 |
| 12 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDS MAXIMUM TEMPERATURE OF 130 DEGREES AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 24 Jan 2025 |
| 12 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 9 May 2025 |
| 12 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT LOWER SASH AT WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 14 Apr 2026 |
| 12 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 28 Feb 2025 |
| 12 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 28 Feb 2025 |
| 12 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Feb 2025 |
| 12 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Feb 2025 |
| 7 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ROOF DOOR | Closed 19 Dec 2024 |
| 6 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE VESTIBULE CEILING AT PUBLIC HALL, 1st STORY | Closed 14 Apr 2026 |
| 6 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE VESTIBULE CEILING AT PUBLIC HALL, 1st STORY | Closed 14 Apr 2026 |
| 6 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH BASEBORD IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 5 May 2025 |
| 6 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 5 May 2025 |
| 6 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 2nd ROOM FROM EAST AT CENTER LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 24 Feb 2025 |
| 6 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST AT CENTER LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 24 Feb 2025 |
| 1 Nov 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE EAST YARD DOOR ''HINGES'' AT PUBLIC HALL, 1st STORY | Closed 22 Nov 2024 |
| 30 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BULKHEAD DOOR AT PUBLIC HALL, 6th STORY | Closed 3 Dec 2024 |
| 30 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER PROTRUDING MORE THAN 4 INCHES OVER WINDOW STOOL AT 3TH STORY BALCONY 2ND STOCK FROM NORTH AT SOUTH EXTERIOR WALL AT BUILDING AT FIRE ESCAPE, 3rd STORY | Closed 24 Feb 2025 |
| 30 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER PROTRUDING MORE THAN 4 INCHES OVER WINDOW STOOL AT 4TH STORY BALCONY AT 2ND STOCK FROM NORTH AT SOUTH EXTERIOR WALL AT BUILDING FRONT AT FIRE ESCAPE, 4th STORY | Closed 24 Feb 2025 |
| 30 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER PROTUDING MORE THAN FOUR INCHES OVER WINDOW STOOL AT 5 STORY BALCONY, 2ND STOCK FROM NORTH AT SOUTH EXTERIOR WALL AT BUILDING FRONT AT FIRE ESCAPE, 5th STORY | Closed 24 Feb 2025 |
| 30 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POT AT 6TH STORY BALCONY AT 2ND STOCK FROM NORTH ST SOUTH EXTERIOR WALL AT BUILDING FRONT AT FIRE ESCAPE, 6th STORY | Closed 24 Feb 2025 |
| 30 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONER PROTRUDING MORE THAN FOUR INCHES OVER WINDOW STOOL AT 6TH STORY BALCONY AT 2ND FIRE ESCAPE FROM NORTH, AT SOUTH EXTERIOR WALL AT BUILDING FRONT AT FIRE ESCAPE, 6th STORY | Closed 24 Feb 2025 |
| 30 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE BATHROOM LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 24 Feb 2025 |
| 30 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 29 Jan 2025 |
| 24 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR LEADING TO PUBLIC HALL STAIRS AT PUBLIC HALL, 6th STORY | Closed 3 Dec 2024 |
| 24 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR FRAME AT BULKHEAD DOOR NORTH SECTION AT PUBLIC HALL STAIRS, 6th STORY | Closed 11 Aug 2025 |
| 24 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR FRAME AT BULKHEAD DOOR, SOUTH SECTION AT PUBLIC HALL STAIRS, 6th STORY | Closed 3 Dec 2024 |
| 4 Oct 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ FT AT CEILING. IN THE KITCHEN LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 17027392 ISSUED 05-JUN-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Closed 5 May 2026 |
| 12 Sept 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 14 Apr 2026 |
| 12 Sept 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 9 May 2025 |
| 12 Sept 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 14 Apr 2026 |
| 12 Sept 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 14 Apr 2026 |
| 29 Jul 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 29 Jul 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH 2ND FROM EASTATSOUTH IN THE 2nd ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 29 Jul 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 29 Jul 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 19 May 2025 |
| 29 Jul 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 29 Jul 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 19 May 2025 |
| 29 Jul 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 19 May 2025 |
| 3 Jul 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE WEST COMPACTOR CLOSET AT PUBLIC HALL, 5th STORY | Closed 25 Jul 2024 |
| 14 Jun 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQ FT AT WINDOW RECESS IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH ORIGINAL VIOLATION 16979535 ISSUED 16-MAY-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Closed 3 Jun 2025 |
| 14 Jun 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKIING AROUND SHOWER STALL PERIMETER IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 2 Dec 2024 |
| 6 Jun 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 9 May 2025 |
| 6 Jun 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 9 May 2025 |
| 6 Jun 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL. IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 14 Apr 2026 |
| 6 Jun 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ FT AT CEILING. IN THE KITCHEN LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 4 Oct 2024 |
| 6 Jun 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING. IN THE KITCHEN LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 9 May 2025 |
| 6 Jun 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR PROVIDE APPROVED TYPE GATE IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 2 Oct 2024 |
| 6 Jun 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL. IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 2 Oct 2024 |
| 6 Jun 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 8 SQ FT AT CEILING. IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 4 Dec 2024 |
| 6 Jun 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING. IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 2 Oct 2024 |
| 17 May 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE MISSING LATCH AT COMPACTOR CLOSET, 1st STORY | Closed 6 Jun 2024 |
| 17 May 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 9 May 2025 |
| 17 May 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 9 May 2025 |
| 17 May 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQ FT AT WINDOW RECESS IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 14 Jun 2024 |
| 22 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT VESTIBULE DOOR , 1st STORY | Closed 16 Aug 2024 |
| 22 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE DOOR , 1st STORY | Closed 12 May 2024 |
| 22 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 31 Jul 2024 |
| 22 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 31 Jul 2024 |
| 22 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 9 May 2025 |
| 22 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 13 Jun 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 9 May 2025 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 9 May 2025 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 14 Apr 2026 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 14 Apr 2026 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 9 May 2025 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 16 Oct 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 3 Jun 2025 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HOLE AT CERAMIC FLOOR TILES APARTMENT DOOR IN THE ENTRANCE LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ENTRANCE DOOR SADDLE IN THE ENTRANCE LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 12 May 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ENTRANCE DOOR SADDLE IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ENTRANCE DOOR SADDLE IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE UPPER AND LOWER SASH AT WINDOW WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT SOUTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 19 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 19 Aug 2024 |
| 16 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DOOR WITH KEY OPERATED LOCK PREVENTING ENTRANCE TO FIRE ESCAPE ROOM IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' | Closed 6 Jun 2024 |
| 16 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DOOR WITH KEY OPERATED LOCK PREVENTING ENTRANCE TO FIRE ESCAPE ROOM IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Closed 6 Jun 2024 |
| 16 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DOOR WITH LOCKABLE KNOB PREVENTING ENTRANCE TO FIRE ESCAPE ROOM IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Closed 8 Jul 2024 |
| 16 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT 1ST FIRE DOOR FROM NORTH, HINGES AT PUBLIC HALL, 5th STORY | Closed 29 Jun 2024 |
| 16 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT FIRE DOOR LEADING TO ROOF AT NORTH, HINGES AT PUBLIC HALL, 6th STORY, SECTION ''NORTH'' | Closed 29 Jun 2024 |
| 16 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT FIRE DOOR LEADING TO COMPACTOR CLOSET AT WEST AT PUBLIC HALL, 4th STORY | Closed 5 Aug 2024 |
| 16 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT FIRE DOOR LEADING TO COMPACTOR CLOSET AT WEST, LATCH AT PUBLIC HALL, 4th STORY | Closed 29 Jun 2024 |
| 16 Apr 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT K5, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' | Closed 18 Jul 2024 |
| 27 Feb 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 14 Apr 2026 |
| 12 Feb 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 15 Apr 2024 |
| 12 Feb 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 15 Apr 2024 |
| 9 Feb 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 26 Feb 2024 |
| 29 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 5H, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 15 Apr 2024 |
| 29 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 5H, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 15 Apr 2024 |
| 29 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 5H, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 15 Apr 2024 |
| 29 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 5H, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 15 Apr 2024 |
| 24 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 15 Apr 2024 |
| 24 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 15 Apr 2024 |
| 24 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEED MAXIMUM TEMPATURE OF 130 AT ALL HOT WATER FIXTURE IN ENTIRE APARTMENT OR / BATHROOM / KITCHEN ONLY IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 24 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 27 Mar 2024 |
| 24 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT FLOOR IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 15 Apr 2024 |
| 24 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 15 Apr 2024 |
| 24 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST | Closed 15 Apr 2024 |
| 19 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Confirmed still open |
| 19 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Confirmed still open |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS. IN THE 2nd ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Confirmed still open |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south'' | Closed 15 Apr 2024 |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD CABINET AT EAST WALL IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south'' | Confirmed still open |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south'' | Closed 15 Apr 2024 |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south'' | Closed 15 Apr 2024 |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south'' | Closed 15 Apr 2024 |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Confirmed still open |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Confirmed still open |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Closed 19 May 2025 |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Closed 19 May 2025 |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Closed 19 May 2025 |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Closed 19 May 2025 |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Confirmed still open |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Confirmed still open |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''South'' | Closed 19 May 2025 |
| 18 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL AT NORTH , 6th STORY | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH AND EAST WALL SOUTH SECTION AT PUBLIC HALL, 6th STORY | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL NORTH AND EAST WALL SOUTH SECTION AT PUBLIC HALL, 6th STORY | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL AT PUBLIC HALL AT , 2nd STORY | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL WEST WALL AT PUBLIC HALL AT , 2nd STORY | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south'' | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south'' | Closed 27 Mar 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south'' | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''south'' | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''south'' | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''south'' | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''south'' | Closed 27 Mar 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING EAST AND SOUTH WALL IN THE FOYER LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''south'' | Closed 15 Apr 2024 |
| 15 Jan 2024 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING EAST AND WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''south'' | Closed 15 Apr 2024 |
| 7 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 15 Apr 2024 |
| 7 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 5 Apr 2024 |
| 6 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 4 Apr 2024 |
| 6 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 15 Apr 2024 |
| 6 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 4 Apr 2024 |
| 6 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 15 Apr 2024 |
| 6 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 10 Feb 2024 |
| 6 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 10 Feb 2024 |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT SOUTH IN THE BATHROOM LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT EAST IN THE BATHROOM LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CLOSET AT CEILING AT NORTH IN THE FOYER LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE FOYER LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER AT SOUTH IN THE FOYER LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN WINDOW STOOL AT SOUTH IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN PARQUET FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW FRAME IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND NORTH WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Dec 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6BWATE, 6th STORY, 4th APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 16 Nov 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLE AT PUBLIC HALL, 4th STORY, SECTION AT SOUTH | Closed 15 Apr 2024 |
| 16 Nov 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING THE MAXIMUM TEMPERATURE OF 130 DEGREES AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 13 Jan 2024 |
| 26 Oct 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Confirmed still open |
| 26 Oct 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Confirmed still open |
| 16 Oct 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING FIRE DOOR AT SOUTH AT PUBLIC HALL, 4th STORY | Closed 13 Jan 2024 |
| 6 Oct 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Closed 29 Dec 2023 |
| 6 Oct 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Closed 2 Feb 2024 |
| 5 Oct 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FIRE DOOR LEADING TO EAST COURT AT PUBLIC HALL, 1st STORY | Closed 13 Jan 2024 |
| 5 Oct 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. ADJUST THE DROPLADDER SO THAT IT WILL SLIDE EASILY IN THE GUIDE RODS FIRE ESCAPE IN WEST COURT AT SOUTH | Closed 2 Feb 2024 |
| 5 Oct 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Closed 2 Feb 2024 |
| 5 Oct 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Closed 2 Feb 2024 |
| 5 Oct 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Closed 2 Feb 2024 |
| 5 Oct 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Closed 2 Feb 2024 |
| 15 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE UPPER SASH AT SOUTH WALL WINDOW IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY | Closed 15 Apr 2024 |
| 15 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE UPPER SASH AT 2ND WINDOW FROM WEST AT NORTH IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY | Closed 15 Apr 2024 |
| 15 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR JOINTS AT ARBOR OPENING AT BUILDING FRONT AT PUBLIC HALL | Closed 15 Apr 2024 |
| 15 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE BULK HEAD DOOR , SECTION AT NORTH AT PUBLIC HALL, 6th STORY | Closed 1 Sept 2023 |
| 3 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONS UNIT PROTRUDING MORE THAN 4 INCHES OUT WINDOW SILL BUILDING FRONT AT NORTH AT FIRE ESCAPE, 4th STORY | Closed 1 Dec 2023 |
| 3 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONS UNIT PROTRUDING MORE THAN 4 INCHES OUT WINDOW SILL BUILDING FRONT AT NORTH AT FIRE ESCAPE, 3rd STORY | Closed 1 Dec 2023 |
| 3 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONS UNIT PROTRUDING MORE THAN 4 INCHES OUT WINDOW SILL SOUTH AT BUILDING FRONT AT FIRE ESCAPE, 3rd STORY | Closed 1 Dec 2023 |
| 3 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIR CONDITIONS UNIT PROTRUDING MORE THAN 4 INCHES OUT WINDOW SILL SOUTH AT BUILDING FRONT AT FIRE ESCAPE, 6th STORY | Closed 1 Dec 2023 |
| 3 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 1 Dec 2023 |
| 2 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE ON SOUTH WALL OF SHOWER IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 27 Nov 2023 |
| 2 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 27 Nov 2023 |
| 2 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 28 Aug 2023 |
| 2 Aug 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 28 Aug 2023 |
| 31 Jul 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSISTING OF BICYCLES AND WARDEROBE SOUTH SECTION AT PUBLIC HALL, 1st STORY | Closed 24 Nov 2023 |
| 28 Jul 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PARTITION WALL ERECTED SUBDIIVIDED THE ROOM IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 27 Jul 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE SECONDARY EXIT DOOR TO STREET AT EAST AT PUBLIC HALL, 1st STORY | Closed 29 Aug 2023 |
| 24 Jul 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 24 Jul 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 24 Jul 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 13 Nov 2023 |
| 18 May 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 13 Nov 2023 |
| 18 May 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). . IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 15 Apr 2024 |
| 18 May 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR . IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 15 Apr 2024 |
| 18 May 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 18 Aug 2023 |
| 18 May 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 18 Aug 2023 |
| 18 May 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE KITCHENETTE LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 15 Apr 2024 |
| 18 Apr 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2046.1, 2046.2 HMC: MAINTAIN ON THE PREMISES AND MAKE AVAILABLE TO THE DEPARTMENT UPON REQUEST RECORDS OF INSTALLATION AND MAINTENANCE OF CARBON MONOXIDE DETECTING DEVICE(S) IN THE BUILDING. | Closed 15 Apr 2024 |
| 18 Apr 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045, 2046 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 17 Aug 2023 |
| 18 Apr 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CELINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 15 Apr 2024 |
| 18 Apr 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 17 Aug 2023 |
| 21 Mar 2023 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 24 Mar 2023 |
| 21 Dec 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING THE ALLOWED MAXIMUM TEMPERATURE OF 130 DEGREES F, IN THE HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 10 Mar 2023 |
| 21 Dec 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 28 Feb 2023 |
| 21 Dec 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT 4th BOILER ROOM | Closed 10 Mar 2023 |
| 19 Dec 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 10 Jan 2023 |
| 16 Dec 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL PLASTER AT EAST WALL AT PUBLIC HALL, 6th STORY, SECTION ''South'' | Closed 17 Apr 2023 |
| 16 Dec 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR TO FIRE STAIR , AT PUBLIC HALL, 6th STORY, SECTION ''South'' | Closed 20 Jan 2023 |
| 16 Dec 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY, SECTION ''South'' | Closed 2 Jun 2023 |
| 16 Dec 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY, SECTION ''South'' | Closed 17 Apr 2023 |
| 16 Dec 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS, PLASTER AT CEILING AT PUBLIC HALL, 1st STORY, SECTION ''South'' | Closed 17 Apr 2023 |
| 1 Dec 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE BULKHEAD TO ROOF AT PUBLIC HALL, 6th STORY | Closed 20 Jan 2023 |
| 1 Dec 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2053 ADM CODE PROVIDE DWELLING WITH A JANITOR OR RESPONSIBLE PERSON OR JANITORIAL SERVICE. | Closed 31 Mar 2023 |
| 31 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING THE MAXIMUM TEMPERATURE OF 130 DEGREES AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH | Closed 20 Jan 2023 |
| 31 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Closed 20 Jan 2023 |
| 31 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH | Closed 20 Jan 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 19 Apr 2024 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 6 Jan 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 6 Jan 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE CAULK AROUND COUNTER TOP AT SINK IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILE SURFACE AND GROUTED JOINTS, AND CAULKING WITH VISIBLE MOLD AT WEST, EAST, AND SOUTH WALLS AROUND SHOWER STALL IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 31 Mar 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL AND SOUTH WALL IN THE FOYER LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 5th ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL AND CEILING IN THE 5th ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT RECESS AREA AROUND NORTH WINDOW IN THE 5th ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL AND CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT RECESS AREA AROUND NORTH WINDOW IN THE 4th ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 6 Jan 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 6 Jan 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LOWER SASH GLASS PANE AT NORTH WINDOW IN THE KITCHEN LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 8 Jul 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL AND CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1 SQ. FT. AT WEST WALL IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 31 Mar 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER SASH COUNTER BALANCE AT NORTH WINDOW IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUBFLOOR IN THE KITCHEN LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 2 SQ. FT. AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 31 Mar 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT RECESS AREA AROUND NORTH WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH AT BATHTUB BY METHOD OF REGLAZING IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FREE STANDING RADIATOR AT PUBLIC HALL, 5th STORY | Closed 27 Oct 2022 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRIC WIRE AT CEILING AT PUBLIC HALL, 5th STORY | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FIRE DOOR AT PUBLIC HALL, 5th STORY | Closed 27 Dec 2022 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIAL AT PUBLIC HALL, 5th STORY | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF FOLDED CARD BOARD PLACED AT FIRE DOOR AT PUBLIC HALL, 2nd STORY | Closed 27 Dec 2022 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES AT PUBLIC HALL, 2nd STORY | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES AT PUBLIC HALL, 1st STORY | Closed 1 Feb 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 2G, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 20 Jan 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 2G, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 27 Dec 2022 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2G, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 20 Jan 2023 |
| 3 Oct 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2G, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST | Closed 20 Jan 2023 |
| 14 Sept 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT ENTRANCE TO THE ROOF AT BULKHEAD AT NORTH SECTION AT PUBLIC HALL STAIRS | Closed 28 Nov 2022 |
| 14 Sept 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ARTICLES ON FLOOR AT NORTH SECTION AT PUBLIC HALL, 6th STORY | Closed 6 Jan 2023 |
| 14 Sept 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT NORTH SECTION AT PUBLIC HALL, 6th STORY | Closed 10 Mar 2023 |
| 14 Sept 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING [CARD BOARD ]JAMMED THE FIRE DOOR 1ST FROM WEST AT NORTH AT PUBLIC HALL, 6th STORY | Closed 28 Nov 2022 |
| 14 Sept 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES SURFACE AND GROUTED JOINTS OF VISIBLE MOLD AT SOUTH WALL AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 15 Apr 2024 |
| 14 Sept 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 15 Apr 2024 |
| 14 Sept 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 18 Jun 2024 |
| 14 Sept 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHENETTE LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 15 Apr 2024 |
| 14 Sept 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCKST AT APARTMENT DOOR IN THE ENTRANCE LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 15 Apr 2024 |
| 14 Sept 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE ENTRANCE LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 12 Dec 2022 |
| 30 Aug 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING THE 5TH TREAD UP FROM 2ND STORY BALCONY AT NORTH FIRE ESCAPE AT BUILDING FRONT CENTER COURT | Closed 29 Aug 2023 |
| 30 Aug 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 28 Nov 2022 |
| 30 Aug 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 28 Nov 2022 |
| 30 Aug 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 9 May 2025 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING [CARD BOARD AT FIRE DOOR 1ST FROM NORTH AT EAST] AT PUBLIC HALL, 2nd STORY | Closed 15 Apr 2024 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE [FIRE DOOR 1ST FROM NORTH AT EAST ] AT PUBLIC HALL, 2nd STORY | Closed 14 Oct 2022 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT ENTRANCE TO BUILDING 1ST FROM NORTH AT EAST AT PUBLIC HALL, 1st STORY | Closed 14 Oct 2022 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 17 Oct 2022 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOOR AT NORTH WALL IN THE FOYER LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 27 Dec 2022 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR TILES IN THE FOYER LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 2 Nov 2022 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 2 Nov 2022 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTICE IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 2 Nov 2022 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRIC BX CABLE AROUND DOOR FRAME AT WEST WALL INSIDE CLOSET AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 2 Nov 2022 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 27 Dec 2022 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER PIPE AT EAST WALL IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 27 Dec 2022 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES SURFACE AND GROUTED JOINTS AND CAULKING OF VISIBLE MOLD AT NORTH , EAST AND SOUTH WALLS AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 27 Dec 2022 |
| 5 Jul 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Closed 27 Dec 2022 |
| 26 May 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF FLOWER POT ON 5TH STORY BALCONY AT NORTH WALL AT FIRE ESCAPE | Closed 15 Sept 2022 |
| 29 Mar 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 29 Mar 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 3 Mar 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES LOCATED AT APT 2L, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 23 May 2022 |
| 1 Mar 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES RANGE IN THE KITCHEN LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH | Closed 14 Apr 2026 |
| 23 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 4 Mar 2022 |
| 18 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 10 Jun 2022 |
| 18 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 23 May 2022 |
| 18 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT RISER IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 13 Jun 2022 |
| 18 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ,,,, IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 10 Jun 2022 |
| 9 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 1 Jun 2022 |
| 9 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 1 Jun 2022 |
| 9 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 1 Jun 2022 |
| 9 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 1 Jun 2022 |
| 9 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR [ ROTTED ] IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 1 Jun 2022 |
| 9 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR [ WARPED ] IN THE PRIVATE HALLWAY LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 1 Jun 2022 |
| 9 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR [ ROTTED ] IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 1 Jun 2022 |
| 9 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR [ WARPED ] IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 29 Jul 2022 |
| 9 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 1 Jun 2022 |
| 9 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 16 May 2022 |
| 9 Feb 2022 | 441 BROOKLYN AVENUEBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Closed 1 Jun 2022 |