5502 Ludlow Street 144-150 Manhattan LLC
1 property · 52 units
Tenant score
No tenant reviews yet. The public record below is drawn from government sources and does not depend on reviews.
Public Records
Bottom 38%of this area owners with records
Fewer housing-code records than 38% of this area owners that have records on file — most owners have none, and are not ranked.
- Violations on record
- 36vs. 69.2 per 100 units
- Confirmed still open
- 17
We have no recorded transfer on file for this property, so the records below may include ones that predate this owner.
We don't yet have complaints and eviction filings for this area, so they are not counted here or in the score. A blank is not a clean record — it means we have nothing to show.
Derived from public records. Not tenant opinion.
Properties and ownership1 property
Ownership records
Public records indicate this owner is connected to 1 property totalling 52 units. Connections between entities are inferred from public filings and are shown with the evidence behind them.
| Property | Units | On record | Recorded |
|---|---|---|---|
| 150 LUDLOW STREETNew York, NYSSL 1004110045 | 52 | 17 | — |
Sources: NYC HPD — Multiple Dwelling Registrations and Registration Contacts. Ownership information is presented as recorded and may be incomplete or out of date.
Company links are inferences from shared addresses, agents and name similarity — never a finding. Each one shows the evidence that produced it.
Tenant reviews (0)
Ordered by what other tenants found helpful (§3.6). Voting changes the order only — never a score.
No published reviews yet.
Every violation on record
The individual records behind the counts above, most recent first.
| Opened | Property | Severity | What was recorded | Status |
|---|---|---|---|---|
| 15 Oct 2025 | 150 LUDLOW STREETNew York, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 10 Apr 2026 |
| 14 Oct 2025 | 150 LUDLOW STREETNew York, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CABINET DOORS AT EAST WALL AND BASE CABINETS AT SINK IN THE KITCHEN LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 10 Apr 2026 |
| 14 Oct 2025 | 150 LUDLOW STREETNew York, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 10 Apr 2026 |
| 14 Oct 2025 | 150 LUDLOW STREETNew York, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AND ASSEMBLY AT APARTMENT ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 8 Sept 2025 | 150 LUDLOW STREETNew York, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 29 Dec 2025 |
| 8 Sept 2025 | 150 LUDLOW STREETNew York, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 29 Dec 2025 |
| 8 Sept 2025 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR OFF HINGE IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 29 Dec 2025 |
| 2 Sept 2025 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION THE WASTELINE AT SINK IN THE KITCHEN LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 29 Dec 2025 |
| 2 Sept 2025 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 29 Dec 2025 |
| 2 Sept 2025 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 29 Dec 2025 |
| 2 Sept 2025 | 150 LUDLOW STREETNew York, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR IN THE ENTRANCE LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 4 Apr 2025 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 4 Apr 2025 | 150 LUDLOW STREETNew York, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 4 Apr 2025 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOODEN WALL CABINET AT EAST WALL IN THE KITCHEN LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 4 Apr 2025 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOODEN BASE CABIN AT EAST WALL IN THE KITCHEN LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 4 Apr 2025 | 150 LUDLOW STREETNew York, NY | Hazardous | § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE CKAKED WATER CLOSET IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 4 Apr 2025 | 150 LUDLOW STREETNew York, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOODEN CLOSET DOOR AT EAST WALL IN THE FOYER LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 19 Sept 2025 |
| 4 Jun 2024 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SADDLE AT ENTRANCE ... IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Jun 2024 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Jun 2024 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CABINET AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Jun 2024 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER CABINET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Jun 2024 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER TOP OF BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Jun 2024 | 150 LUDLOW STREETNew York, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Jun 2024 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE SINK IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 4 Jun 2024 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 17 May 2024 | 150 LUDLOW STREETNew York, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT FIREDOOR LEADING TO STAIR A AT PUBLIC HALL, 2nd STORY | Closed 9 Jul 2024 |
| 17 May 2024 | 150 LUDLOW STREETNew York, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed 9 Jul 2024 |
| 17 May 2024 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE COUNTER TOP AT LOWER BASE CABINETS WEST WALL IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 17 May 2024 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER WALL CABINET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 17 May 2024 | 150 LUDLOW STREETNew York, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT AT THE BUILDING FRONT ENTRANCE DOOR | Closed 7 Mar 2025 |
| 17 May 2024 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CARDBOARD AND HOUSEHOLD ITEM AT BUILDING ENTRANCE FRONT COURT | Closed 7 Mar 2025 |
| 17 May 2024 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING IN BUILDING FRONT ENTRANCE CANOPY, BASEMENT LEVEL | Closed 7 Mar 2025 |
| 17 May 2024 | 150 LUDLOW STREETNew York, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN BUILDING FRONT ENTRANCE CANOPY, BASEMENT LEVEL | Closed 3 Oct 2024 |
| 26 Apr 2023 | 150 LUDLOW STREETNew York, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 10 Aug 2023 |
| 26 Apr 2023 | 150 LUDLOW STREETNew York, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMAL GLAZE AT BATH TUB IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 16 Oct 2023 |
| 8 Mar 2022 | 150 LUDLOW STREETNew York, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDâS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 23 Mar 2022 |