442 Lorimer Ny LLC
1 property · 53 units
Tenant score
No tenant reviews yet. The public record below is drawn from government sources and does not depend on reviews.
Public Records
Bottom 24%of this area owners with records
Fewer housing-code records than 24% of this area owners that have records on file — most owners have none, and are not ranked.
- Violations on record
- 94vs. 177.4 per 100 units
- Confirmed still open
- 25
We have no recorded transfer on file for this property, so the records below may include ones that predate this owner.
We don't yet have complaints and eviction filings for this area, so they are not counted here or in the score. A blank is not a clean record — it means we have nothing to show.
Derived from public records. Not tenant opinion.
Properties and ownership1 property
Ownership records
Public records indicate this owner is connected to 1 property totalling 53 units. Connections between entities are inferred from public filings and are shown with the evidence behind them.
| Property | Units | On record | Recorded |
|---|---|---|---|
| 54 MAUJER STREETBrooklyn, NYSSL 3027920002 | 53 | 25 | — |
Sources: NYC HPD — Multiple Dwelling Registrations and Registration Contacts. Ownership information is presented as recorded and may be incomplete or out of date.
Company links are inferences from shared addresses, agents and name similarity — never a finding. Each one shows the evidence that produced it.
Tenant reviews (0)
Ordered by what other tenants found helpful (§3.6). Voting changes the order only — never a score.
No published reviews yet.
Every violation on record
The individual records behind the counts above, most recent first.
| Opened | Property | Severity | What was recorded | Status |
|---|---|---|---|---|
| 20 Oct 2025 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 5th ROOM FROM NORTH LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 19 Mar 2026 |
| 20 Oct 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE EAST AND WEST WALLS IN THE 5th ROOM FROM NORTH LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 14 Oct 2025 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORY | Closed 22 Apr 2026 |
| 14 Oct 2025 | 54 MAUJER STREETBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 14 Jan 2026 |
| 14 Oct 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 9 Jul 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR FRAME IN THE ENTRANCE LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 19 Sept 2025 |
| 9 Jul 2025 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL IN THE KITCHEN LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 26 Sept 2025 |
| 9 Jul 2025 | 54 MAUJER STREETBrooklyn, NY | Hazardous | 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GAPS OR CRACKS IN WALLS, CEILINGS, FLOORS, FIXING LEAKS AND MANAGING GARBAGE IN PUBLIC AREAS. EVIDENCE FOUND AT KITCHEN IN THE ENTIRE APARTMENT LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 3 Oct 2025 |
| 9 Jul 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 19 Sept 2025 |
| 9 Jul 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERABLE IN THE ENTIRE APARTMENT LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 19 Sept 2025 |
| 8 Jul 2025 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST, SOUTH, WEST, AND NORTH WALLS IN THE 5th ROOM FROM NORTH LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 19 Sept 2025 |
| 8 Jul 2025 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST, SOUTH, WEST, AND NORTH WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 19 Sept 2025 |
| 8 Jul 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 8 Jul 2025 | 54 MAUJER STREETBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 23, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 9 Oct 2025 |
| 9 Jun 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 27, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 8 May 2026 |
| 9 Jun 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 17, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 8 May 2026 |
| 9 Jun 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 16, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 8 May 2026 |
| 9 Jun 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 12, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Closed 8 May 2026 |
| 9 Jun 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Closed 8 May 2026 |
| 9 Jun 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 28 Sept 2026 |
| 9 Jun 2025 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 28 Jul 2026 |
| 28 May 2025 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Confirmed still open |
| 28 May 2025 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Confirmed still open |
| 15 Jan 2025 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR LEADING TO BOILER ROOM AT WEST YARD | Closed 13 Feb 2025 |
| 15 Jan 2025 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOORS AND ALL LANDINGS AT PUBLIC HALL | Closed 4 Apr 2025 |
| 15 Jan 2025 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND SHOWER STALL FLOOR IN THE BATHROOM LOCATED AT APT 8, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 11 Apr 2025 |
| 15 Jan 2025 | 54 MAUJER STREETBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 11 Apr 2025 |
| 13 Jan 2025 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 2nd ROOM FROM NORTH LOCATED AT APT 8, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 27 Mar 2025 |
| 4 Sept 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DISCARDED REFRIGERATOR AT REAR YARD ENT. WITHOUT DOORS AT PUBLIC HALL, 1st STORY | Confirmed still open |
| 4 Sept 2024 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT CEILING LIGHT FIXTURE AT PUBLIC HALL, 1st STORY | Closed 3 Mar 2025 |
| 4 Sept 2024 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF AT CEILING AT PUBLIC HALL, 1st STORY | Closed 3 Mar 2025 |
| 19 Aug 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 19 Aug 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, WEST WALL AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 19 Aug 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MARBLE THRESHOLD AT ENTRANCE IN THE BATHROOM LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 19 Aug 2024 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 19 Aug 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 19 Aug 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 19 Aug 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 19 Aug 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 19 Aug 2024 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR LOWER DOOR IN THE KITCHEN LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 19 Aug 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 10, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 16 Jul 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF MULTIPLE ELECTRICAL EXTENSION CORD IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 19, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 5 Apr 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE CEILING IN THE BATHROOM LOCATED AT APT 23, 5th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16500011 ISSUED 06-DEC-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). | Confirmed still open |
| 15 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 19, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 20 May 2024 |
| 15 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 19, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 6 May 2024 |
| 15 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW AT 2ND WINDOW FROM SOUTH AT WEST IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 19, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 6 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER SASH WINDOW SPRING BALANCE AT 1ST WINDOW FROM SOUTH AT WEST AT FIRE ESCAPE IN THE 3rd ROOM FROM NORTH LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 HMC: REFIT THE 1ST WINDOW FROM SOUTH AT WEST IN THE 1st ROOM FROM NORTH LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE REPAIR DOOR HINGES IN THE ENTRANCE LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 3 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ENTRANCE DOOR FRAME IN THE BATHROOM LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER TEMPERATURE EXCEEDING 130 DEGREES IN THE BATHROOM LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE SOUTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE 1ST WINDOW FROM SOUTH AT WEST 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE 1ST WINDOW FROM SOUTH AT WEST CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 8 Feb 2024 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 20 May 2024 |
| 7 Dec 2023 | 54 MAUJER STREETBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 23, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 14 Mar 2024 |
| 7 Dec 2023 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE CEILING IN THE BATHROOM LOCATED AT APT 23, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 5 Apr 2024 |
| 7 Dec 2023 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 23, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 24 May 2024 |
| 7 Dec 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 23, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 5 Apr 2024 |
| 7 Dec 2023 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Confirmed still open |
| 7 Dec 2023 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHEN LOCATED AT APT 23, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 1 Jan 2024 |
| 7 Dec 2023 | 54 MAUJER STREETBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 10, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 14 Mar 2024 |
| 7 Dec 2023 | 54 MAUJER STREETBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 10, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 14 Mar 2024 |
| 4 Dec 2023 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATH TUB IN THE BATHROOM LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 22 Feb 2024 |
| 30 Nov 2023 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Feb 2024 |
| 30 Nov 2023 | 54 MAUJER STREETBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Feb 2024 |
| 30 Nov 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY-OPERATED LOCK AT DOOR LEADING TO FIRE ESCAPE WINDOW AT 2ND WINDOW FROM EAST AT SOUTH IN THE 3rd ROOM FROM NORTH LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 29 Mar 2024 |
| 30 Nov 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY-OPERATED LOCK AT DOOR LEADING TO FIRE ESCAPE WINDOW AT 1ST WINDOW FROM NORTH AT EAST IN THE 1st ROOM FROM NORTH LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 29 Mar 2024 |
| 30 Nov 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 29 Mar 2024 |
| 30 Nov 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 29 Mar 2024 |
| 30 Nov 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 29 Mar 2024 |
| 30 Nov 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 29 Mar 2024 |
| 30 Nov 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 29 Mar 2024 |
| 30 Nov 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE BATHROOM LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 30 Nov 2023 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 20, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 24 May 2024 |
| 31 Oct 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 24, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 31 Oct 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 25 SQ FT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 24, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 31 Oct 2023 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 24, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 11 Apr 2023 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT CEILING ABOVE STEAM RISER IN THE KITCHEN LOCATED AT APT 12A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 12 Jul 2023 |
| 11 Apr 2023 | 54 MAUJER STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 12A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 12 Jul 2023 |
| 25 Apr 2022 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 12A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 5 Aug 2022 |
| 22 Apr 2022 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 12A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 5 Aug 2022 |
| 22 Apr 2022 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 12A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 5 Aug 2022 |
| 22 Apr 2022 | 54 MAUJER STREETBrooklyn, NY | Serious | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING TO WEST WALL IN THE BATHROOM LOCATED AT APT 12A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 5 Aug 2022 |
| 22 Apr 2022 | 54 MAUJER STREETBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 12A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Confirmed still open |