190 Berry Brooklyn Owner LLC C O Cim Group
1 property · 40 units
Tenant score
No tenant reviews yet. The public record below is drawn from government sources and does not depend on reviews.
Public Records
Top 5%of this area owners with records
Fewer housing-code records than 95% of this area owners that have records on file — most owners have none, and are not ranked.
- Violations on record
- 27vs. 67.5 per 100 units
- Confirmed still open
- 20
We have no recorded transfer on file for this property, so the records below may include ones that predate this owner.
We don't yet have complaints and eviction filings for this area, so they are not counted here or in the score. A blank is not a clean record — it means we have nothing to show.
Derived from public records. Not tenant opinion.
Properties and ownership1 property
Ownership records
Public records indicate this owner is connected to 1 property totalling 40 units. Connections between entities are inferred from public filings and are shown with the evidence behind them.
| Property | Units | On record | Recorded |
|---|---|---|---|
| 103 NORTH 3 STREETBrooklyn, NYSSL 3023500026 | 40 | 20 | — |
Sources: NYC HPD — Multiple Dwelling Registrations and Registration Contacts. Ownership information is presented as recorded and may be incomplete or out of date.
Company links are inferences from shared addresses, agents and name similarity — never a finding. Each one shows the evidence that produced it.
Tenant reviews (0)
Ordered by what other tenants found helpful (§3.6). Voting changes the order only — never a score.
No published reviews yet.
Every violation on record
The individual records behind the counts above, most recent first.
| Opened | Property | Severity | What was recorded | Status |
|---|---|---|---|---|
| 18 Sept 2026 | 103 NORTH 3 STREETBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 18 Sept 2026 | 103 NORTH 3 STREETBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH,2ND WINDOW FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 18 Sept 2026 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 18 Sept 2026 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE TWO SPRINKLER HEADS AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 18 Sept 2026 | 103 NORTH 3 STREETBrooklyn, NY | Moderate | § 27-2005 HMC: REFIT LOWER SASH ,WINDOW IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 18 Sept 2026 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES THE RANGE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 14 Sept 2026 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 14 Sept 2026 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 14 Sept 2026 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES THE RANGE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 1 Jul 2026 | 103 NORTH 3 STREETBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 1 Jul 2026 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 1 Jul 2026 | 103 NORTH 3 STREETBrooklyn, NY | Moderate | § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 1 Jul 2026 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 6 Aug 2026 |
| 25 Jun 2026 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2). 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 25 Jun 2026 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2). 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 25 Jun 2026 | 103 NORTH 3 STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 25 Jun 2026 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2). 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 25 Jun 2026 | 103 NORTH 3 STREETBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 5 May 2026 | 103 NORTH 3 STREETBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 1 Jun 2026 |
| 21 Jul 2025 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 2nd WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 10 Oct 2025 |
| 21 Jul 2025 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RISER FROM SOUTH AT WEST WALL, SOUTH WALL, WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 10 Oct 2025 |
| 21 Jul 2025 | 103 NORTH 3 STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 21 Jul 2025 | 103 NORTH 3 STREETBrooklyn, NY | Hazardous | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 10 Oct 2025 |
| 21 Jul 2025 | 103 NORTH 3 STREETBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY THE METHOD OF REGLAZING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 21 Jul 2025 | 103 NORTH 3 STREETBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 10 Jun 2025 | 103 NORTH 3 STREETBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 1 Jun 2026 |
| 11 Apr 2024 | 103 NORTH 3 STREETBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 26 Jun 2024 |