1112 Dean LLC
1 property · 40 units
Tenant score
No tenant reviews yet. The public record below is drawn from government sources and does not depend on reviews.
Public Records
Bottom 22%of this area owners with records
Fewer housing-code records than 22% of this area owners that have records on file — most owners have none, and are not ranked.
- Violations on record
- 107vs. 267.5 per 100 units
- Confirmed still open
- 8
We have no recorded transfer on file for this property, so the records below may include ones that predate this owner.
We don't yet have complaints and eviction filings for this area, so they are not counted here or in the score. A blank is not a clean record — it means we have nothing to show.
Derived from public records. Not tenant opinion.
Properties and ownership1 property
Ownership records
Public records indicate this owner is connected to 1 property totalling 40 units. Connections between entities are inferred from public filings and are shown with the evidence behind them.
| Property | Units | On record | Recorded |
|---|---|---|---|
| 1354 BEDFORD AVENUEBrooklyn, NYSSL 3012110039 | 40 | 8 | — |
Sources: NYC HPD — Multiple Dwelling Registrations and Registration Contacts. Ownership information is presented as recorded and may be incomplete or out of date.
Company links are inferences from shared addresses, agents and name similarity — never a finding. Each one shows the evidence that produced it.
Tenant reviews (0)
Ordered by what other tenants found helpful (§3.6). Voting changes the order only — never a score.
No published reviews yet.
Every violation on record
The individual records behind the counts above, most recent first.
| Opened | Property | Severity | What was recorded | Status |
|---|---|---|---|---|
| 1 May 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 11 May 2026 |
| 30 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 28 Feb 2026 |
| 30 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR | Closed 13 Apr 2026 |
| 30 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 13 Apr 2026 |
| 29 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOM | Closed 13 Apr 2026 |
| 28 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 13 Apr 2026 |
| 28 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 13 Apr 2026 |
| 26 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER ABOVE 130 DEGREES IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 13 Apr 2026 |
| 26 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 8 Apr 2026 |
| 26 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 8 Apr 2026 |
| 26 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 8 Apr 2026 |
| 26 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM | Closed 8 Apr 2026 |
| 26 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER ABOVE 130 DEGREES IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Closed 19 Feb 2026 |
| 26 Jan 2026 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Closed 17 Feb 2026 |
| 16 Dec 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Closed 27 Feb 2026 |
| 16 Dec 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE PEEPHOLE AT APARTMENT DOOR IN THE ENTRANCE LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 2 Mar 2026 |
| 16 Dec 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDED MAXIMUM ALLOWABLE TEMPERATURE OF 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Feb 2026 |
| 15 Dec 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Feb 2026 |
| 10 Dec 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM ... INCORRECT CONTACT INFORMATION DISPLAYED AT PUBLIC HALL, 1st STORY | Closed 23 Feb 2026 |
| 10 Dec 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Closed 23 Feb 2026 |
| 10 Dec 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 23 Feb 2026 |
| 10 Dec 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 30 Mar 2026 |
| 10 Dec 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 30 Mar 2026 |
| 10 Dec 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING MAXIMUM ALLOWABLE TEMPERATURE OF 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 23 Feb 2026 |
| 6 Jun 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 12 Jun 2025 |
| 18 Feb 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 2 May 2025 |
| 18 Feb 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 2 May 2025 |
| 28 Jan 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE EAST SECTION, AT PUBLIC HALL, 1st STORY | Closed 14 Apr 2025 |
| 28 Jan 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT, DOOR LEADING TO CENTRAL COURT FROM , WEST WALL, EAST SECTION, AT PUBLIC HALL, 1st STORY | Closed 6 Mar 2025 |
| 28 Jan 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CRACKED GLASS AT WINDOW'S LOWER SASH , 2ND FROM NORTH AT EAST WALL, AT PUBLIC HALL, 1st STORY | Closed 14 Apr 2025 |
| 14 Jan 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Closed 3 Feb 2025 |
| 14 Jan 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 31 Mar 2025 |
| 14 Jan 2025 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Closed 31 Mar 2025 |
| 5 Dec 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BASEMENT | Closed 18 Feb 2025 |
| 5 Dec 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 30 Dec 2024 |
| 5 Dec 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT APT2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 13 Jan 2025 |
| 5 Dec 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM NORTH LOCATED AT APT APT2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 18 Feb 2025 |
| 27 Nov 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 3rd ROOM FROM NORTH LOCATED AT APT APT2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 19 Dec 2024 |
| 27 Nov 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE 3rd ROOM FROM NORTH LOCATED AT APT APT2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Closed 13 Feb 2025 |
| 1 Jul 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLES AT PUBLIC HALL, 5th STORY | Closed 12 Sept 2024 |
| 1 Jul 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY | Closed 12 Sept 2024 |
| 1 Jul 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT PUBLIC HALL, 1st STORY | Closed 12 Sept 2024 |
| 15 Apr 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: REFIT VESTIBULE DOOR , 1st STORY | Closed 8 Aug 2024 |
| 15 Apr 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE VESTIBULE DOOR (REFIT) , 1st STORY | Closed 16 May 2024 |
| 15 Apr 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT HOPPER DOOR TO TRASH CHUTE AT PUBLIC HALL, 6th STORY | Closed 16 May 2024 |
| 27 Feb 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKING DEVICE ON LOWER SASH WINDOW TO FIRE ESCAPE IN THE 1st ROOM FROM EAST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 29 May 2024 |
| 27 Feb 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER AND LOWER SASH WINDOW FRAME, 1ST FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Confirmed still open |
| 27 Feb 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASEBOARD HEATING SYSTEM AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 29 May 2024 |
| 23 Feb 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Closed 14 Apr 2024 |
| 23 Feb 2024 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Closed 14 Apr 2024 |
| 23 Feb 2023 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 19 May 2023 |
| 23 Feb 2023 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, AND CEILING IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 19 May 2023 |
| 23 Feb 2023 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS AT LOWER SASH WINDOW IN THE PRIVATE HALLWAY LOCATED AT APT 3G, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Closed 15 May 2023 |
| 22 Feb 2023 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE CEILING APPROX 2 SQ.FT. IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 2 Jun 2023 |
| 22 Feb 2023 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS,AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed 2 Jun 2023 |
| 22 Feb 2023 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 2 Jun 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES ON THE FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES ON THE FLOOR IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES ON THE FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES ON THE FLOOR IN THE FOYER LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRIC LIGHT FIXTURE AT THE CEILING IN THE FOYER LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 21 Feb 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REFIT THE DOOR AT THE CLOSET AT WEST IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SHOWER HEAD IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 2nd ROOM FROM EAST, THE BATHROOM , THE 1st ROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 10 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINIMUM OF 100 WATTS OF INCANDESCENT LIGHT REQUIRED AT FRONT AREAWAY | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINIMUM OF 100 WATTS OF INCANDESCENT LIGHT REQUIRED. (LIGHT FIXTURE PRESENT) | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINIMUM OF 100 WATTS OF INCANDESCENT LIGHT REQUIRED. (LIGHT FIXTURE PRESENT) | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM .. AT PUBLIC HALL, 1st STORY | Closed 24 Jan 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM ,DOOR LOCKED AT PUBLIC HALL, 1st STORY | Closed 24 Jan 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCES AT UPPER & LOWER WINDOW SASHES IN THE PRIVATE HALLWAY LOCATED AT APT 3G, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Confirmed still open |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINIMUM OF 100 WATTS OF INCANDESCENT LIGHT REQUIRED (LIGHT FIXTURE PRESENT) | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF A. C. UNIT AT FIRE ESCAPE WINDOW LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 21 Feb 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Hazardous | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT ENTRANCE DOOR LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 24 Jan 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER WINDOW SASHES IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOORS IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE REFIT COUNTER BALANCE OF WINDOW SASH AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 21 Feb 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 21 Feb 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Confirmed still open |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE OF CONCEALED WATER LEAK AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Closed 21 Feb 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER NORTH WINDOW SASH IN THE FOYER LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER AND IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER AND IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE FOYER LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER AND IN THE FOYER LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 27 Mar 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st RADIATOR FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 21 Feb 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , EAST WALL, SOUTH WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st DOOR FROM SOUTH AT WEST WALL, CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 21 Feb 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 21 Feb 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES THROUGH OUT IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 21 Feb 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PLASTER BOARD CEILING IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Confirmed still open |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENTILATORS BATHROOM AND IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 21 Feb 2023 |
| 21 Dec 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Serious | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOORS IN THE PRIVATE HALLWAY LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Closed 21 Feb 2023 |
| 23 Feb 2022 | 1354 BEDFORD AVENUEBrooklyn, NY | Moderate | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Closed 9 Jun 2022 |